Tens of thousands of dams, many built before seismic engineering came of age, have the potential to release tsunami-like flash floods in the event of a seismic breach.
成百上千的水坝,很多都建在防震工程学诞生之前,如果地震灾害发生,则很有可能会释放像海啸一样突如其来的洪灾。
Soil-pile-structure interaction was a difficult problem in bridge seismic engineering.
桩—土—结构相互作用问题一直是桥梁抗震研究中的难点。
Seismic stability of slope is one of hot problems in geotechnical seismic engineering and earthquake engineering field.
地震作用下边坡的稳定性问题是当前岩土地震工程和地震工程学研究的热点问题之一。
The vulnerability assessment of underground pipelines is significant for risk assessment system of lifeline anti-seismic engineering.
地下管道的易损性评价是生命线地震工程风险评价体系的重要研究内容。
Planar ray theory is used to deduce the analytic solution of the elevation amplification effect on a single-free-face slope in seismic engineering.
利用平面射线理论和方法,推导出单面边坡地震的高程放大效应理论解,可用于描述边坡临空面对地震波的反射,反映边坡的高程放大效应。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
应用推荐