Xiongguantang Reservoir; seepage analysis; seepage gradient; seepage quantity.
熊官塘水库;渗流分析;渗透比降;渗流量。
The threshold pressure gradient of low permeability sandstone was studied experimentally by measuring the pressure attenuation in an unsteady seepage flow.
为了研究低渗透砂岩的启动压力梯度,设计了一种非稳态渗流中测量压力的试验方法。
With the model, many parameters can be obtained such as water head, equivalent mechanical fissure width, seepage coefficient, and hydraulic gradient etc.
应用该模型可计算出二维裂隙网络中任意交点(内结点)的水头、等效水力隙宽、渗透系数、水力梯度等参数。
Experiments show that a low permeable reservoir has a starting pressure gradient, and therefore different seepage rule from that of middle and high permeable reservoirs.
实验表明,低渗透油藏具有启动压力梯度,因此其渗流规律与中、高渗透油藏不同。
The effect of practice showed that the seepage prevention wall is beneficial to reducing the seepage water head, decreasing the seepage line inside dike and escape gradient.
实际应用显示钢板桩的实施有利于减小渗流水头、降低堤身浸润线和出逸比降。
Meantime, the pressure gradient region, which producing the non-linear seepage flow, was calculated.
并确定了产生非线性渗流的压力梯度区域。
If the blanket length reaches certain value, its hydraulic gradient is steady and the variety of seepage discharge also not obvious.
当铺盖长度达到一定值时,水力坡降稳定且渗流量的变化也不明显。
In view of seepage process in vertical fracture well in low permeability reservoir, considering kickoff pressure gradient and media deformation coefficient, bilinear flow model is established.
针对低渗透地层垂直裂缝井的渗流过程,考虑了启动压力梯度和介质变形系数的影响,建立了三线流模型。
The singularity of hydraulic gradient, which is always found in the calculation of seepage at the toe of dam, is not accord with the reality and makes the trouble in judging the safety of the dam.
根据现行计算方法,堤坝下游坡脚处渗流水力坡降具有奇异性,这给工程设计中判别渗透安全性带来困难,同时与实际情况也不符合。
The seepage of CFRD joints is studied by using finite element calculation and complex variable function. The analytical equations of seepage quantity and gradient are deduced.
通过有限元计算和复变函数推导,系统研究了面板接缝的渗流规律,给出了接缝渗流量和渗透比降的解析计算公式,可用于面板堆石坝接缝渗流控制的设计。
The results showed that mobility and start-up pressure gradient are the main reasons of non-linear seepage flow effect.
结果表明流度与启动压力梯度是形成非线性渗流的主要因素。
To control foundation seepage and exit gradient, a plastic concrete cut-off wall, a grout curtain, and a set of downstream pressure relief Wells are incorporated in the design.
为了控制基础渗流和出逸坡降,设计采用了塑性混凝土防渗墙、帷幕灌浆以及在下游增设一套减压井相结合的方案。
To control foundation seepage and exit gradient, a plastic concrete cut-off wall, a grout curtain, and a set of downstream pressure relief Wells are incorporated in the design.
为了控制基础渗流和出逸坡降,设计采用了塑性混凝土防渗墙、帷幕灌浆以及在下游增设一套减压井相结合的方案。
应用推荐