• Combining with some reconstruction engineering, construction technology of half top-down method for swirl sedimentation tank of rolling plant is introduced.

    结合改造工程,介绍了轧钢厂旋流沉淀池池壁筒体逆作法施工技术

    youdao

  • Afterwards, the subsidence-sedimentation process slowed down gradually in the south of the Hefei Basin in the Middle-Late Jurassic without any strengthening phenomenon.

    随后中—晚侏罗世时盆地南部沉降—沉积强度显示出变趋势,期间没有出现沉降—沉积再加强现象

    youdao

  • Afterwards, the subsidence-sedimentation process slowed down gradually in the south of the Hefei Basin in the Middle-Late Jurassic without any strengthening phenomenon.

    随后中—晚侏罗世时盆地南部沉降—沉积强度显示出变趋势,期间没有出现沉降—沉积再加强现象

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定