The Lagrangian formulation of the critical dynamics is recovered in the second order approximation of fluctuations in the closed time path continuous integral.
在闭路连续积分中取涨落二级近似,得到临界动力学的拉氏场论表述。
The Lagrangian formulation of the critical dynamics is recovered in the second order approximation of fluctuations in the closed time path continuous integral.
在闭路连续积分中取涨落二级近似,得到临界动力学的拉氏场论表述。
应用推荐