• Because the pipeline diameter in platform is one third of that in tidal channel, so the limit scour length is less.

    平台由于设计管径仅为潮汐通道区的三分之一,极限冲刷长度远小于潮汐通道区。

    youdao

  • The main channel bed will scour if sediment amount from tributary debris is less than that the main stream can carry and the river evolution exhibits the characteristic of mountainous rivers.

    支沟泥石流输入泥沙量小于主河时,主河河床下切逐渐恢复山区性河流特征

    youdao

  • The depth of river channel scour is calculated by the scour rate and scour time.

    河道冲刷深度主要决定于冲刷冲刷历时。

    youdao

  • The strong scour resistance and stability of the Banks and coming big floods always with high sediment concentration are the key fators for forming a narrow and deep channel in the lower wei River.

    河岸稳定性较强经常出现含沙量洪水形成渭河下游河槽关键

    youdao

  • High velocity of flow channel in the bottom mat, mat extended length according to the cage height and maximum scour depth to determine.

    流速河道应在下部设置网,网垫伸出长度根据网箱高度最大冲刷深度确定。

    youdao

  • High velocity of flow channel in the bottom mat, mat extended length according to the cage height and maximum scour depth to determine.

    流速河道应在下部设置网,网垫伸出长度根据网箱高度最大冲刷深度确定。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定