RUP解决范围风险。
Addressing scope risk: The Inception phase.
处理范围风险:初始阶段。
I then described the activities which occur during the RUP's Inception phase to get the project started and to address the scope risk associated with the effort.
然后,我介绍了发生于RUP初始阶段过程中的活动,以启动项目,并处理与工作相关的范围风险。
Its scope does not include an assessment of risk for coffee and other hot beverages.
它的范围不包括对咖啡和其他热饮的风险评估。
The scope and nature of the problem is only beginning to be delineated, many risk factors remain contested, and the evidence for what works to prevent elder maltreatment is limited.
对该问题范围和性质的描述才刚刚开始,对许多风险因素仍存有争议,而证明能够有效预防虐待老人情况发生的证据也依旧有限。
To accommodate a wider scope and range of threats, vulnerabilities, and risks in today's world we need to expand the risk life cycle.
为了处理当今世界中更大范围的威胁、漏洞和风险,我们需要对此风险生命周期进行扩展。
The Vision document is the greatest risk mitigation factor during Inception, ensuring that our iterations will have a solid scope they are working within, or improving upon.
愿景文档是初始过程中最大的风险减少因素,确保我们的迭代拥有一个它们工作,或改进的坚固范围。
In this context, WHO is concerned about the potential inclusion of vaccines in the scope of the treaty given the lack of evidence that thiomersal presents a risk to human health.
在这种情况下,考虑到缺乏证据表明硫柳汞对人类健康构成风险,世卫组织担心疫苗可能会被列入条约的范围。
Understanding and gaining agreement on project objectives, deliverables, scope, risk, cost, approach, etc.
理解项目目标、可交付物、范围、风险、成本、方法并且达成一致。
However, the use of time sheets, costs, and schedules far outweigh the more important issues like project benefits, risk management, stakeholder involvement, quality, scope, and objective control.
但是使用到工时单,成本和日程安排等却使更重要的事情如项目利益、风险管理、持份者参与、质素、范围、目标控制等得不到应有的注目。
If the requirements are loosely defined, then consider the risk of scope creep exponentially increased.
如果没有准确地定义需求,范围渐变的风险指数将上升。
This will include sections on how the team will manage issues, scope change, risk, quality, communication, and so on.
包括团队应如何管理问题、范围变更、风险、质量及沟通等。
Facilitating communication regarding the project scope, schedule, risk, performance, cost etc with the stakeholders throughout the project life cycle.
便于在整个项目生命周期中,对项目范围,进度,风险,绩效,成本等问题与项目干系人沟通。
It's a practice that not only puts women at risk, Woodruff argues, but also limits the scope of our scientific knowledge.
这一行为不仅使女性时刻处于危险之中,Woodruff辩驳道,而且也局限了我们科学知识的范围。
The project lifecycle provides stakeholders with oversight, transparency, and steering mechanisms to control project funding, scope, risk exposure, value provided, and other aspects of the process.
项目生命周期向 涉众提供了监督、透明和指导机制,从而控制项目资金、范围、风险、价值以及该过程的其他方面。
They provide a framework for scope identification, gap assessment, and risk assessment to develop a roadmap to design and implement a solution.
参考体系结构提供一个用于确定项目范围、评估差距和评估风险的框架,可以为设计和实现解决方案开发一个路线图。
The open cover shall stipulate the scope of cover, the range of property insured, the maximum amount of insurance each risk or at each place and the method of settling premium, etc.
预约保险合同应当订明预约的保险责任范围、保险财产范围、每一保险或一地点的最高保险金额、保险费结算办法等。
Rescuers may not need to risk their lives anymore: Active scope cameras and other robots can go where humans can't.
救援人员或许不需要再冒生命的危险工作了:蛇形机器人和其他机器人可以去人类无法到达的地方。
The four areas are Scope, Quality, Communication and Risk Management.
这四个领域是范围管理、质量管理、沟通管理和风险管理。
You have limited scope definition and you want to protect your company from financial risk.
你只有有限的范围定义,而你想保护公司规避财务风险。
When identifying risk and risk amounts, it is important to consider the scope of risks to be covered, holding period, confidence interval, correlation between risks, and stress testing.
在把握风险种类和程度时,必需要考虑风险对象的范围、持有期限、信赖水平、各风险之间的关系和压力测试理念。
The project manager spends time planning, managing, assessing, and controlling scope, time, cost, quality, risk, resources, and customer satisfaction.
项目经理花时间做的事情包括:规划、管理、分派任务,控制范围、时间成本、质量、风险、资源和客户满意度。
The scope and the method of calculating the aforesaid equity capital and risk assets shall be as prescribed by the Competent Authority.
前项所称自有资本与风险性资产,其范围及计算方法,由主管机关定之。
Has there been changes to employee counts, risk levels, addresses, support locations or anything that could affect the audit (e. g. scope, duration, audit team composition, etc)?
是否有存在员工人数,风险水平,地址,支持场所或任何影响审核正常实施的变化(如:范围,持续时间,审核组构成等等)?
This article presents the background of vehicle project management for Line 8, Shanghai Rail Tranist, project risk target and scope of evaluation.
本文介绍了上海轨道交通8号线车辆项目管理的背景以及项目风险目标和评估范围。
Along with constantly extend and stretch of internal auditing scope, the risk of internal auditing also in escalation.
随着内部审计范围的不断扩大和延伸,内部审计的风险也在不断增加。
Performance reports provide information on the project's performance with regard to scope, schedule, cost, resources, quality, and risk.
绩效报告提供了有关项目在范围、进度、费用、资源、质量与风险方面绩效的信息。
Is also difficult to estimate the extent the scope of the problem, the number of users at risk.
目前也难估计,该问题的范围有多大,多少用户还处于危险中。
Business assets within this scope must be identified to drive the risk discussions.
必须确定在此范围内的企业资产以推动风险讨论。
Business assets within this scope must be identified to drive the risk discussions.
必须确定在此范围内的企业资产以推动风险讨论。
应用推荐