After the planning, the key point of cost control is in the design stage, and in which the schematic design is the most important.
在项目作出决策后,控制工程造价的关键就在于设计阶段,而设计阶段中的方案设计阶段又尤为重要。
Involve the schematic design team, especially the design in DD stage.
在组长组织下,提前参与方案组设计工作,尤其是扩初阶段工作。
Involve the schematic design team, especially the design in DD stage.
在组长组织下,提前参与方案组设计工作,尤其是扩初阶段工作。
应用推荐