Most significant in this area is support for cron-style scheduling in addition to the EJB 3.0 interval based timer API.
除EJB 3.0基于间隔的计时器API 外,这个领域最重大的改进是对cron 风格调度的支持。
The first version was built primarily to support clustering, job scheduling, and MPI 2 based applications.
HPC Server 2008的第一个版本主要着重于支持集群、任务计划以及基于MPI2的应用程序。
The Linux kernel performs thread scheduling based on static controls, such as thread priority levels, and on certain dynamic conditions of the threads executing in the system.
Linux核心可以根据静态控制(如线程优先级级别)和系统中执行的线程的某些动态条件下来执行线程调度。
DelayQueue: a time-based scheduling queue backed by a priority heap.
DelayQueue:一个由优先级堆支持的、基于时间的调度队列。
So for a university based cloud computing system to be economically viable, it requires a proper scheduling mechanism to monitor demand and allocate the system resources.
因此,大学内的云计算系统要想具有经济可行性,它需要一种适当的调度机制来监视需求并分配系统资源。
This paper presents a hierarchical scheduling algorithm based on NUMA topology after analyzing the O(1) scheduling algorithm's support for NUMA.
该文在深入分析O(1)调度算法对NUMA支持的基础上,提出一种基于NUMA拓扑结构的分级调度算法。
The purpose of the thesis is to provide a model of grid task scheduling based on mobile agent environment combined with thought of virtual organization.
目的是结合虚拟组织思想,给出在移动代理环境下的网格任务调度的模型。
The software for phased array radar scheduling based on hybrid GA with heuristic rules is developed at last and the feasibility and validity are demonstrated using simulation results.
最后开发了结合启发式规则的混合遗传算法相控阵雷达调度软件系统,并利用仿真结果验证了算法的可行性和有效性。
This paper introduces a dynamic aggregation based scheduling algorithm.
文中提出了一种用动态聚合进行调度的算法。
Program producing, arranging, and scheduling based on MHP norm are important parts of the current TV program producing and scheduling platform.
基于MHP规范的节目制作、编排和调度式播控是当前电视节目制播平台的重要组成部分。
To propose a modeling strategy of rolling horizon scheduling based on a rough sets theory and the general control idea.
提出了一种基于粗集理论和广义控制思想的滚动调度建模策略。
The commodity market model was compared with the auction model from the aspects of resource allocation and task scheduling based on economic models in computational grids.
基于经济模型的计算网格资源分配和任务调度,将货物市场模型与拍卖模型进行比较。
A modeling strategy of rolling optimal scheduling based on rough sets theory and feedback correction of general control is presented.
提出一种基于粗集理论和广义控制的滚动优化调度建模策略。
Any duplication based task scheduling algorithm can integrate it easily.
任何一种基于复制的调度算法都可以和它结合使用。
It proposes an adaptive process scheduling approach based on linear regression.
提出一种基于线性回归的自适应调度方法。
A scheduling algorithm based on combining slack time and value is presented in this paper.
提出了基于综合事务空闲时间与价值的优先级调度算法。
A scheduling algorithm based on priority table design is presented in this paper.
提出了一种基于优先级表设计的调度算法。
The thesis mainly focuses on the dynamic scheduling method based on the averaged rewards reinforcement learning algorithms.
论文主要研究了基于平均型强化学习算法的动态调度方法。
A shop scheduling prototype system based on multi agent architecture is implemented.
本文实现了一个基于多智能体结构的车间调度原型系统。
For this purpose, a multipoint real time speech mixing and scheduling algorithm based on packet network is put forward and then realized.
为此,提出并实现了一种基于分组网络的多点实时语音混合及调度算法。
An approach to realize shop dynamic scheduling system based on multi agent architecture is proposed in this paper.
本文提出了一种基于多智能体结构的车间层动态调度方法。
PFS is regarded as the acceptable scheduling logic based on the decomposition of process structure that is more suitable to process industry.
提出PFS是适合于过程工业的一种基于过程结构分解的全过程调度逻辑。
Finally, the proposed method was proven to be feasible and effective through the comparison with a kind of typical whole rescheduling method (scheduling method based on multi-Agent).
最后,通过与一种典型的整体重调度方法(基于多智能体的调度方法)的比较,验证了该方法的可行性和有效性。
A feedback scheduling based on model predictive control (FS-MPC) was presented to improve the control performance of real-time control system subject to limited computational resource.
提出一种基于模型预测控制(MPC)的反馈调度算法(FS - MPC),可以在有限计算资源的情况下改进实时控制系统的性能。
This paper will study under layered real-time scheduling problem, which is based on the theory of MAS (Multi-agent System).
本文基于多智能体系统理论,研究了多智能体机器人系统的底层实时调度问题。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The paper presents a new approach, which is called dynamic priority scheduling based on total potential reduction, to solving the multi robot path planning and coordination problem.
本文提出了一种解决多机器人路径规划与协调问题的新方法:基于总体势减小的优先级动态调度策略。
The paper presents a new approach, which is called dynamic priority scheduling based on total potential reduction, to solving the multi robot path planning and coordination problem.
本文提出了一种解决多机器人路径规划与协调问题的新方法:基于总体势减小的优先级动态调度策略。
应用推荐