The above suma command will return a suma task ID that might later be used to perform an immediate download of a schedule task.
上面的suma命令将返回一个suma任务ID,稍后在执行计划任务的立即下载时会使用到这个任务ID。
In the parallel test System, the testing programs are to compete for instruments concurrently. Therefore, how to allocate instruments and schedule task is a key to parallel test.
在并行自动化测试系统中,并发执行的多个测试程序会竞争有限的仪器资源,硬件资源的分配与任务调度是并行测试的一个关键问题。
We often use the domain controller as the time server and run the Windows Schedule task on the involved Lotus Connections server hosts to do time synchronization with the domain controller.
我们经常将域控制器作为时间服务器使用,并在有关的LotusConnections服务器主机上运行WindowsSchedule任务以完成与域控制器的时间同步。
Thanks to your help, we accomplished the task ahead of schedule.
亏得你们帮忙,我们才提前完成了任务。
The task has been accomplished according to schedule.
任务已如期完成。
For the first execution it is recommended not to set up a repeating schedule for this indexing task.
对于第一次执行来说,我们建议不要为此索引任务设置重复的时间表。
After starting your task or project, take out your favorite calendar app and start "blocking" out time in your schedule to complete the task.
当你开始任务或项目,使用你最常用的日程软件并在你的日程表中做好完成这项任务的时间计划。
This time, each member has been assigned a task and a schedule.
这次,每一位成员都被指派了一项任务和一份时间表。
Both men said that it was essential to busy themselves with a daily schedule, no matter how mundane each task might be.
这两人都表示,有必要给自己制定一个时间表,让自己每天都有事可做,哪怕是很小的任务都可以。
For a daily build, you need to schedule the system task automatically.
对于每日构建,您需要自动计划系统任务。
Having examined task 1.1, you would immediately realize that although this is not graphically marked in your project schedule, there is a dependency between this task and an earlier task 2.1.
检查任务1.1时,你会马上意识到虽然你的项目进度计划中并没有用图示标明,但是这个任务同一个更早的任务2.1之间存在依赖关系。
You can discover, run and schedule tests, as well as being able to define and enable human task emulators, as shown in Figure 6.
您可以发现、运行和计划安排测试,并且能够定义和启用人工任务模拟器,如图6所示。
Make sure to schedule a life cycle task with the scheduler with a fire time of 30 seconds.
确保调度程序将该生命周期任务安排为具有30秒钟的执行时间。
How do I create and schedule a task that would check weekly for a new SP release (for example, every Thursday at 3:00 am)?
我应该如何创建和实现每个星期检查新的SP发布的计划任务(例如,每个星期四的凌晨3:00)?
How do I create and schedule a task that would check monthly for a TL release (for example, on the 15th of every month at 2:30 am)?
我应该如何创建和实现每个月检查TL发布的计划任务(例如,在每个月15号的凌晨2:30)?
How do I create and schedule a task that would check monthly for a CSP release (for example, on the 15th of every month at 2:30 am)?
我应该如何创建和实现每个月检查CSP发布的计划任务(例如,在每个月15号的凌晨2:30)?
For this example, suppose the analyst notices a new data field is needed for the Schedule Training task.
对于此示例,假设分析人员注意到ScheduleTraining任务需要一个新数据字段。
Schedule training is a local task that automatically assigns the employee to standard company training.
ScheduleTraining是个局部任务,它自动分配员工参与标准公司培训。
Now you are asked to specify the schedule for the new task as Figure 19 indicates.
现在,要为新任务指定调度计划,见图19。
How do I create and schedule a task that downloads the latest security fixes monthly (for example, on the 15th of every month at 2:30 am)?
我应该如何创建和实现每个月下载最新的安全修复程序的计划任务(例如,在每个月15号的凌晨2:30)?
Based on the expectations of your users you will wish to schedule your index update Task to incrementally update the contents of the index.
基于用户的期望,您将希望安排IndexUpdateTask以便增加更新索引内容。
Return to the initial Index Update task that you created and schedule the task to run at your desired interval (refer to "schedule Management" in the Administration and Security Guide).
返回到您所创建的初始indexUpdateTask,并在您想要的时间间隔上安排该任务运行(请参见管理和安全性指南中的“进度管理”)。
A schedule should be created for each Index update Task that meets both the business requirements as well as how often the data is updated.
为每一个满足业务需求以及数据更新频率的IndexUpdateTask创建一个时间表。
If there is no error, you can add it to the job schedule as a routine task.
如果没有错误,那么可以将它作为一个例程任务添加到任务调度中。
Choose a small area or one drawer to get started and schedule time to complete the task.
选择一个小领域或者一个抽屉来开始,然后安排好完成工作的时间。
We assigned a budget to each prototype, and a schedule that included interim reviews prior to task completion.
我们为每个原型分配了预算和时间计划,这里包括了任务完成之前的中期检查。
Don't insist that a task be done on your schedule.
在日程表上,不要过分坚持要完成某项任务。
In other words, the more tasks (n) are active, the longer it takes to schedule a task.
换而言之,活动的任务越多,调度任务所花费的时间越长。
Of course.You have finished the task a week ahead of schedule.
当然,你已经提前一周完成任务了。
Of course.You have finished the task a week ahead of schedule.
当然,你已经提前一周完成任务了。
应用推荐