A generalized real time connection schedule model is presented.
提出了一种通用实时连接调度模型。
To improve the real-time communication performance of Ethernet, a simple data schedule model is introduced.
为改善以太网通信的实时性,系统引入了一种简单的数据调度模型。
Examples include a mortgage calculator and payment schedule model, a prod UCt break-even model, and a sales forecasting model.
例如抵押计算器和偿还进度表模型,产品收支平衡模型,和销售预测表。
By calculating and analyzing the non-linear relationship between the status of cars with automatic transmission and the optimum shift based on neural-network, the shift schedule model can be obtained.
通过对电控自动变速器汽车的状态与最佳档位之间的非线性关系进行基于神经网络的计算和分析,得出换档规律模型。
Refine schedule and budget estimates based on details of the design model.
基于设计模型的细化时间进行计划和预算的预估。
In iterative testing, we therefore schedule both business usage model reviews and system testing activities with customers whose environments differ.
在迭代测试中,我们因此根据处于不同环境中的客户来同时确定商业使用模型检查和系统测试活动的时间进度。
If you built a model to schedule a network of trains, could you re-use that model to calculate the depreciation of those trains?
如果你建立一个模型来指定列车时刻表,你会使用当初用来计算火车折旧的模型吗?
To understand the role of a developer in this new architecture, let's focus on the "Schedule Interview" activity of the process model (Figure 5).
为了理解开发人员在这个新架构中的角色,让我们仔细看看过程模型的“面试安排(Schedule Interview)”活动(图5)。
An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.
在时间-费用关系为非线性的假设下,建立求网络计划最低成本日程的优化模型。
There is one management problem with the spiral model: how do you schedule the iterations?
有一个螺旋模型与管理问题:你如何安排的迭代?
But each individual has his or her special schedule, so how to build a reasonable meeting arrangement model becomes an urgent task.
但是,由于每个人的日程安排不同,如何构建一个合理的会议安排模型也就成为一个课题。
By cases, this paper explains that this model can effectively shorten the project cycle and provide project schedule management with new thinkings.
论文通过实例说明了该模型可以有效地缩短项目周期,为项目进度管理提供了新的思路。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Precise dynamic model of engine is the foundation of making shift schedule and realizing optimal match of vehicle powertrain.
精确的发动机动态模型是制定换挡规律并实现车辆动力传动系统最佳匹配的基础。
Model is built by constraints of develop cost and schedule in the example fire control radar conceptual design, calculational conclusion demonstrates the effectiveness of the proposed model.
最后以火控雷达的概念设计为例,以研制费用和研制进度为约束条件建立模型,计算说明此模型是有效的。
A monkey algorithm based simulation method to the model was designed, and used to a filling station project schedule numerical simulation.
针对这个模型设计了基于猴群算法的模糊模拟求解方法,并对某加气站项目进度进行了数值模拟。
In addition, performance simulations for the federal urban driving schedule are carried out to evaluate the effect of the response lag on the HEV fuel economy using the HEV powertrain model.
此外,还采用HEV动力系模型对联邦城市驱动计划性能仿真进行估算响应滞后对燃油经济性的影响。
The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.
论文将进度预警模型应用于DS水闸枢纽工程,给出了进度点的警情值,从而为风险应对提供了理论依据。
Secondly, the theory base and mathematic model was introduced along with the corresponding heuristic algorithms of the Multi-Restrict Airline Schedule Optimizat.
其次介绍了“多元受限的航班时刻优化模型”的理论基础、数学模型、相应的启发式算法。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
On the basis of that, the aviation model development project management schedule control framework was proposed.
在此基础上,提出了航空型号研制项目管理的进度控制模型。
This paper studies an integral programming model of production schedule in rayon factory, presents the method of solution and application example.
本文给出了人造丝厂生产作业计划整数规划模型、求解方法和应用实例。
This paper is mainly about the model and arithmetic of Airline Schedule Optimization Problem.
其次介绍了“多元受限的航班时刻优化模型”的理论基础、数学模型、相应的启发式算法。
Therefore, it has strong realistic meaning and a certain theory value to study on construction-schedule early-warning model of waterlocks key project.
因此,水闸枢纽工程施工进度预警模型研究具有很强的现实意义和一定的理论价值。
The case study shows that the model can be a help to hydropower company to constitute the risk-constrained optimal regulation schedule.
算例结果表明,该模型有助于水电厂在短期优化调度中制定计及风险约束下的发电调度计划。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
Having researched the production schedule of the factory, the mathematical model has been built.
研究了某工厂生产调度问题,建立了数学模型。
Having researched the production schedule of the factory, the mathematical model has been built.
研究了某工厂生产调度问题,建立了数学模型。
应用推荐