Proposes an efficient TIN-based node schedule method for field estimation in wireless sensor networks.
针对场监测应用的特点提出了一种基于不规则三角网(TIN)的无线传感器网络节点调度方法。
In this paper, we will take Q6 flight training simulator as an example to explain the principle and use of the quasi-dynamic task schedule method.
文中以Q 6飞行训练模拟器为例,说明了准动态任务调度方法的原理和使用过程。
Firstly, the schedule performance prediction problem in the six statues is described. The plan valued rate method, earned duration method and the earned schedule method are then introduced.
首先描述六种项目状态下项目进度预测问题,系统阐述计划价值率法、挣得工期法和挣得进度法的进度预测方法。
Some sharp disputes remained involving the new police force and the schedule and method of putting arms beyond use.
一些尖锐的争论尚未解决,包括新建立的警察队伍及解除武器的方法和时间表。
They collected and logged in the most expedient method for the project schedule.
他们以最便利的方法为项目进度收集数据并记录。
Manage resource – This interface provides a method to schedule the resources in the pool.
管理资源 –该界面提供一种方法来调度资源池中的资源。
Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resource leveling, and critical chain methods.
在这一步中所用到的工具包括:关键路经法,计划压缩,what-if脚本分析,资源水平,关键链。
Adopting a plan-and-track governance method and moving out the schedule to account for the variance, or.
采用计划和跟踪管理方法,并且超出进度来计算偏差,或者。
Agile COCOMO is a method and accompanying tool that are geared for lightweight incremental cost and schedule estimation.
敏捷COCOMO是一种用于轻量级的增量的成本和日程评估的工具。
Controllingthe method fuzzily of main production schedule.
主生产计划的模糊控制方法。
Use this method for monitoring J2EE, non-J2EE, and Web service applications that do not have automated application monitoring, which is the situation with a performance test or schedule.
使用这个方法可以监控那些没有进行自动化监控的J2EE、非j2ee和Webservice应用程序,这可以适用于性能测试或者调度的情况。
This paper presents an efficient method to work out the unit startup and shutdown schedule in electric power system based on the optimal and suboptimal unit combination.
本文提出一种按机组最佳与次最佳组合求取电力系统机组开停机计划的有效方法。
Discuss the main fuzzy characteristic of production schedule and describe first, put forward controlling the method thought fuzzily of main production schedule.
先讨论主生产计划模糊特性及其描述,提出主生产计划的模糊控制方法思想。
Choice of movement, arrangement of schedule and the choice of teaching method should conform to the law of movement skills.
从动作的选择、进度的安排到教法的选择都要符合动作技能形成的规律。
This method has the obvious effect to ensure the construction safety, speed up the construction schedule and reduce the construction cost.
该方法在确保施工安全、加快施工进度、降低施工成本方面具有显著的效果。
Strengthen construction management and extend use new management method can promote engineering schedule and shorten time of project and saving fund and reduce cost.
只有加强施工管理,推广使用新管理方法,才能促进工程进度,缩短工期,节约资金,降低造价。
And provide the comprehensive fuzzy general step of controlling the method of production schedule.
并给出了综合生产计划模糊控制方法的一般步骤。
A monkey algorithm based simulation method to the model was designed, and used to a filling station project schedule numerical simulation.
针对这个模型设计了基于猴群算法的模糊模拟求解方法,并对某加气站项目进度进行了数值模拟。
For this status, this paper proposes a new load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units.
针对此现状,提出了一种负荷率偏差法,用于解决直调火力发电单元月度电能交易计划编制问题。
Later on, you need to learn how to develop the operant conditioning method into a reinforcement schedule, so that you'll know when it's appropriate to give out good and bad rewards for things.
稍后,你需要学习怎样在强化日程表中增加行为条件,以便你知道什么时候应该提供好或坏的回报。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
Combined with method based on order and serial schedule generation scheme and multi-project task list, the gotten scheduling scheme can meet the project schedule constraints of precedence relations.
采用基于排列的方法和串行项目进度生成机制,结合多项目的任务列表,可以保证所得调度方案满足项目优先关系约束。
As for the schedule , everyone has their own method , mostly like to write down the details about today's matter.
对于计划,每个人有每个人的方式,我最喜欢的是把一天要做的所有事情都全写下来。
This paper studies an integral programming model of production schedule in rayon factory, presents the method of solution and application example.
本文给出了人造丝厂生产作业计划整数规划模型、求解方法和应用实例。
Providing services required because of signIficant changes in the Project, including size, schedule, materials, method of bidding or construction contracting or construction management.
因工程的重大变化(包括工程规模、进度、材料、招标方法、或施工承包或施工管理等)的要求而提供的相应服务。
This paper introduces system analysis method, perpendicular analysis method, experimental schedule arrangement and management that adopted in emission experiment of vehicle's ICE.
本文介绍了系统分析法、正交分析法、优化技术、试验计划安排和管理等方法和手段在车用内燃机排放试验中的应用。
With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.
通过工程实例,介绍了钢管拱桁架节段吊装施工的方法与原理、施工程序、施工布置及技术要点等。
The most effective method for deciding if a schedule is serializable is Two-phase locking protocol.
判断一个调度是否可串行化调度的最有效方法是两段锁协议。
Based on deformation features of bloom in blooming mill, the rational design method of reduction schedule is proposed.
本文分析了初轧的变形特点,研究了基本的计算模型及压下制度的计算方法。
Based on deformation features of bloom in blooming mill, the rational design method of reduction schedule is proposed.
本文分析了初轧的变形特点,研究了基本的计算模型及压下制度的计算方法。
应用推荐