• The performance measure of the scheduling problem is schedule length.

    排序问题性能测度排序长度

    youdao

  • For factory assembled units replace last 3 zeros with length code. See Thermoplastic Valves, Strainers & Accessories, Price Schedule V-1 for length codes.

    对于工厂组装装置长度代码更换型号中最后3个零请参阅热塑性塑料阀门过滤器附件价格目录V-1了解长度代码。

    youdao

  • A typical heuristic algorithm, TDS, can generate optimal schedule in scheduling length under optimality condition.

    TDS典型算法优化条件下得到问题调度长度上的最解。

    youdao

  • The journal should be kept electronically in a printable form. It will be handed in three times during the semester (see schedule). The final journal should be about 10 pages in length.

    日志持在电子化可列印形式学期必须交参见时间表),最终的日志必须大约长达10页。

    youdao

  • As to schedule tasks to processors, an algorithm with the shortest scheduling length is always emphasized, and using as less processors as possible is always ignored in this algorithm.

    对于任务调度多个处理器问题,人们往往注重找到一个调度路径最短的算法,却忽略了要节省处理器。

    youdao

  • The proposed scheduling algorithm can generate a schedule with the least Scheduled Length and a minimal number of Processors, and without any communication between Processors.

    调度算法能够保证任务的调度长度最小,所需处理器数目尽量少,没有处理机通信开销。

    youdao

  • The proposed scheduling algorithm can generate a schedule with the least Scheduled Length and a minimal number of Processors, and without any communication between Processors.

    调度算法能够保证任务的调度长度最小,所需处理器数目尽量少,没有处理机通信开销。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定