The asynchronous, schedule-based, scaleable qualities of job-oriented management are well suited for performing periodic administrative operations from the central data center out to the branches.
面向作业管理的异步、基于计划、可伸缩的特性特别适合于从中央数据中心对分店执行定期管理操作。
Based on that information we can derive all the required messages and also an update schedule for the participants.
根据这一信息,我们能够产生出所有需要的消息,同时为参与者生成一个更新时间表。
Based on sketchy information about the problems to be solved and vague goals, the project manager does his or her best to "guess" what the schedule and costs will look like.
基于这些对需要解决的问题和不明确的目标的粗略信息,项目经理会尽最大努力来“猜测”时间日程表和大概成本。
These projects were based around and driven by the construction schedule for the buildings, a very sequential process.
这些项目工作是由建筑物的施工进度驱动的,是一个非常有序的过程。
A replication schedule is automatically set up between the MQT and the nickname on which this MQT is based.
一个复制计划被自动设置在MQT和该MQT所基于的昵称之间。
Based on the expectations of your users you will wish to schedule your index update Task to incrementally update the contents of the index.
基于用户的期望,您将希望安排IndexUpdateTask以便增加更新索引内容。
I may eventually develop a new sense of time based on my polyphasic sleep schedule, but for right now I have a more timeless feeling.
或许随后我会基于多相睡眠建立一个新的时间概念。
The data used in FIGURE 1 and FIGURE 2 is based on the ten-digit Harmonized Tariff Schedule (HTS), the most precise measure of solar cell and module imports available (specifically 8541.40.6020&6030).
图1和图2使用的数据基于10位数的海关关税明细表,市面上可获得的最精确太阳能电池和模块(8541.40.6020&6030)测量数据。
Refine schedule and budget estimates based on details of the design model.
基于设计模型的细化时间进行计划和预算的预估。
There is no pre-defined schedule; you need to find the "project rhythm" that suits you best, based on how long the build takes, how often developers can deliver, and so on.
没有预定义的进度表;你需要找到最适合你的“项目节奏”,这是基于你的构建要花费多长时间,开发人员多久提交一次,等等。
Setting a schedule based on your own personal needs.
可根据你的个人需求制定工作时间表。
The administrator attempts to schedule job processes at incremental time slots based on expected duration of each job execution.
管理员要根据每个作业预期的执行时间,确定调度作业处理的时间间隔。
The CPU usage thus gathered is used by the kernel, which may schedule or de-schedule a process based on its priority, current CPU usage, and CPU limits.
内核使用收集的CPU 使用量数据,可以根据优先级、当前 CPU使用量和 CPU 限制调度或撤消运行进程。
It will explore using a visually guided, directory-based (tree-based) editor and steps to create, edit, schedule the emulation, and get analysis reports.
它将探索一个视觉指导的、基于目录的(基于树形结构的)编辑器和步骤来创建、编辑、确定评价时间、并且获得分析报告。
The evidence was loud and clear today -- Lindsay violated probation by failing to attend her alcohol ed classes based on the schedule set by the judge.
今天的证据很确凿----琳赛违抗了拘留缓刑(她没有参加法官制定的饮酒教育培训班日程)。
You can create cash flow schedule using the account structures or you can build a report in the excel link based requirement information.
您可以使用账户结构创建现金流量表附表或使用 Excel链接创建一个基于需求信息的报告。
So if the provider is called to generate a TrustedCredential to store with a schedule it can generate this credential based on a user name only.
因此,如果调用提供者已生成与时间表一起存储的TrustedCredential,它可以只基于用户名生成这个凭证。
Resolution: the data in the Alloy sidebar panel is automatically refreshed based on a schedule set by the administrator.
解决方法:Alloy侧边栏面板中的数据会根据管理员设定的时间安排自动刷新。
Lotus Workflow is an application that allows your organization to plan, schedule, track, monitor, and archive its document-based work and projects.
LotusWorkflow是一种应用程序,可以帮助组织计划、调度、跟踪、监控和存档基于文档的工作和项目。
Their expectations for both deliverables and schedule were somewhat flexible and allowed us to run with the RUP-based approach without too much impact.
ASDI 的对于交付产物和时间进对期望是有些灵活性的,并且允许我们使用基于RUP 的方法进行开发。
She checks orders on the computer after school, then makes adjustments to her schedule based on the daily demand for her product.
她在放学后在计算机上核对定单,然后再根据对她产品的日常需求来对其进度表进行调整。
This paper presents an efficient method to work out the unit startup and shutdown schedule in electric power system based on the optimal and suboptimal unit combination.
本文提出一种按机组最佳与次最佳组合求取电力系统机组开停机计划的有效方法。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
Manufacturing status is established during production meetings to identify key date activities based upon the production schedule.
生产会议将确定生产状态,根据生产进度时间表确立关键日活动。
Based on the introduction to neural network principle, two methods of solving free train schedule and traffic flow prediction in transportation system with neural network are analyzed.
在简要介绍神经网络原理的基础上,分析了采用神经网络解决交通系统中空车调度及交通流预测的原理及方法。
Based on the introduction to neural network principle, two methods of solving free train schedule and traffic flow prediction in transportation system with neural network are analyzed.
在简要介绍神经网络原理的基础上,分析了采用神经网络解决交通系统中空车调度及交通流预测的原理及方法。
应用推荐