-
Following the required loading conditions of the foundation, a sand bedding course was used for its groundsill.
根据建筑荷载以及实际情况进行方案比选,采用了砂垫层换填法处理地基。
youdao
-
Following the required loading conditions of the foundation, a sand bedding course was used for its groundsill.
根据建筑荷载以及实际情况进行方案比选,采用了砂垫层换填法处理地基。
youdao