The solidification process of turntable in sand-faced iron mould was numerically studied, and the basic parameters of the process were obtained.
对轮盘的铁型覆砂铸造成形过程进行了数值模拟,获取了铸造填充过程的基本参数。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
Whether the natural sand gravel stratum in the river bed would serve as the foundation of the superhigh faced rockfill dam or not was one of the key technical problems of the project.
河床天然砂卵砾石层能否作为超高面板坝坝基是该工程的关键技术问题之一。
Although the development of oil sand is faced with kinds of challenges, its future is encouraging.
尽管目前油砂在开发过程中仍面临各种挑战,但发展前景看好。
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
应用推荐