In order to control the subsidence of the interval tunnel and guarantee the safety of operation strictly, pipe-jacking is used as pre-support for the first time.
为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,首次采用了顶管作超前预支护。
In order to control the subsidence of the interval tunnel and guarantee the safety of operation strictly, pipe-jacking is used as pre-support for the first time.
为了严格控制既有环线区间隧道的沉降,确保环线地铁运营安全,首次采用了顶管作超前预支护。
应用推荐