• The forecast system of mine roof water disaster based on the fuzzy matter-element model is made up of with the data information administer system and the forecast system of mine roof water inrush.

    基于模糊物元模型矿井顶板预测系统主要矿井顶板涌水数据信息管理系统、矿井顶板涌水预测系统两部分组成。

    youdao

  • Base on the back ground of Dafosi mine project, the key strata theory and cusp catastrophe theory was applied to analyze the mine water inrush mechanism from roof.

    以大佛寺煤矿工程背景,运用关键理论突变理论分析了采场顶板透水的发生机理,认为基岩关键层突发性破断失稳是顶板突水的诱因。

    youdao

  • It is one of the important research projects in the field of controlling water-inrush from roof that the calculating method of water flowing fracture height caused by coal mining.

    煤层开采所引发上覆岩层导断裂带高度计算方法矿井顶板水害防治中的重要研究课题之一

    youdao

  • Finally, in the comparison analysis with the simulation test results of the solid material, the paper explained that the catastrophe theory to analyze the roof water inrush would be feasible.

    最后固体相似模拟实验结果对比分析说明应用突变理论分析顶板突水机理可行

    youdao

  • Finally, in the comparison analysis with the simulation test results of the solid material, the paper explained that the catastrophe theory to analyze the roof water inrush would be feasible.

    最后固体相似模拟实验结果对比分析说明应用突变理论分析顶板突水机理可行

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定