• Most of the monitoring systems for roof bed separation are designed based on RS-485 BUS, which is low in both signal transmission efficiency and reliability.

    国内顶板离层计算机测控系统采用RS- 485总线传输效率可靠性不高。

    youdao

  • The main factors effecting of slipping area along the bed rock and roof separation and failure area and the major avenue of damage surrounding rock caused by mining are analyzed in this paper.

    分析影响沿底座顶板离层破坏区破坏主要因素及其损害传递的途径

    youdao

  • The main factors effecting of slipping area along the bed rock and roof separation and failure area and the major avenue of damage surrounding rock caused by mining are analyzed in this paper.

    分析影响沿底座顶板离层破坏区破坏主要因素及其损害传递的途径

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定