In this paper, the primary influence on maximum plane size of roller-compacted concrete pavement plate is discussed.
本文探讨了影响碾压混凝土路面板块平面尺寸的主要因素。
Roller-compacted revetment with high backfilling thick ness has been widely used in water conservancy works, public works and bank protection for port engineering.
碾压堆石体在高回填的港口护岸、水利堤防、市政建设项目中得到广泛应用。
That both the structure and material of gravity DAMS and construction means of earth DAMS are used in roller compacted concrete DAMS make them increasingly used in water engineerings.
碾压混凝土坝将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
That both the structure and material of gravity dams and construction means of earth dams are used in roller compacted concrete dams makes them increasingly used in water engineering.
碾压混凝土坝将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
That both the structure and material of gravity dams and construction means of earth dams are used in roller compacted concrete dams make them increasingly used in water work.
碾压混凝土坝将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
That both the structure and material of concrete dams and construction means of earth dams are used in roller compacted concrete dams make RCC dam increasingly used in water engineerings.
碾压混凝土将混凝土坝结构和材料与土石坝施工方法两者的优越性结合起来,在水利工程中得到愈来愈多的运用。
It is very important for designers to understand the inner stresses and displacements of layered roller compacted concrete structure.
成层碾压混凝土结构的内部应力和位移对其设计十分重要。
To increase the shear strength on lift joints of the high roller compacted concrete dam (RCCD), a kind of construction method is brought forward.
理论分析认为这一施工技术对提高碾压混凝土层缝的抗剪强度效果显著。
It is then compacted by the traffic if there is nit enough money to allow a road roller to be used.
在资金不允许使用压路机的情况下,则可由道路上行驶的车辆将路面自然压实。
The construction of the roller compacted concrete dam needs four dry seasons and four flood seasons to reach the design elevation.
碾压混凝土拦河坝工程须经过四个枯水期四个汛期的施工才能达到设计高程。
Depressed trough, manhole edges and other places where the roller can not reach shall be compacted with frog rammer.
在压路机不能达到的路槽和检查井边缘,采用蛙式打夯机夯实。
The problem of thermal stress and a need for temperature control in the mass concrete construction also occur in the roller compacted concrete dams(RCCD).
大体积混凝土的温度应力问题与温度控制要求在碾压混凝土坝中同样存在。
The proportioning characteristics and performance requirements to admixtures of pavement roller compacted cement concrete are introduced in this paper.
介绍路面碾压混凝土的配合比特点及对外加剂的性能要求;
The effect of air content on the frost resistance of roller compacted concrete(RCC)is discussed.
试验研究了含气量对碾压混凝土抗冻性的影响。
Based on the analysis of the seepage reasons of the roller compacted concrete, a design idea against seepage of the RCC dam is developed in this article, in which anti seepage is the stress.
在碾压混凝土渗透成因分析的基础上,本文提出以防为主,防排结合的碾压混凝土坝体渗控设计概念。
The surface between roller compacted layers of concrete dam is a weak link of dam.
碾压混凝土坝碾压层之间的层面是坝体的薄弱环节。
Roller compacted concrete is a new kind of material.
碾压混凝土是一种新型坝体材料。
Technology for RCC (roller Compacted concrete) is important progress of concrete construction technology and Chaotic vibratory roller is modern technology of vibratory roller.
碾压混凝土(RCC)技术是混凝土建造技术的重要进展,而混沌振动碾压是振动碾压的近代技术。
Roller compacted concrete (RCC) is a super-stiff concrete.
碾压砼是一种超干硬性砼。
There is the size effect in roller compacted concrete specimen as in concrete specimen.
碾压混凝土试件与混凝土试件一样也存在着尺寸效应。
CCFM series vibration rolling machines use external vibration roller compacted molding technology.
CCFM系列振动碾压成型机采用外置式振动碾压成型技术。
The results show that: roller compacted steel fiber reinforced concrete is more suitable for road surface material.
结果表明,碾压钢纤维混凝土材料是一种具有应用前景的新型路面材料。
Through the comparison the three center single arch dam was finally selected, thus high speed construction of the roller compacted concrete can be put in practice.
通过比选最终确定为三心圆单曲拱坝,坝身不布置泄洪建筑物,从而实现了碾压混凝土的快速施工。
Coupled seepage and temperature fields in Longtan roller compacted concrete gravity dam are analyzed by applying the mathematical model for coupled seepage and temperature fields in concrete dam.
应用混凝土坝渗流场与温度场耦合分析的数字模型,进行了龙滩碾压混凝土重力坝稳定渗流场与稳定温度场的耦合分析。
The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...
碾压式沥青混凝土心墙以及过渡带的施工是与主坝坝体填筑同步进行的。
Along with prevalent application of roller compacted concrete technique, the problem of thermal stress is urgently solved.
随着碾压混凝土技术的普及应用,温度应力问题急需解决。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
The best roller compacted parameter is determined by roller compaction test. Filling and roller compaction are carried out strictly in accordance with dam filling techniques.
通过碾压试验确定了最优碾压参数。对填筑料、碾压等严格按照坝体填筑施工技术要求施工并严格进行质量检查与控制。
Roller compacted asphalt concrete core wall is built by spreading hot-mixed asphalt concrete with a certain thickness and then shaping-rolled by vibratory roller.
碾压式沥青混凝土心墙,是将热拌后的沥青混合料按一定的厚度摊铺在铺筑部位上,然后用适当的振动碾碾压成型。
Experimental thermal parameters of concrete material considering the temperature conditions during construction were used in the design of Xibing Roller Compacted Thin Arch Dam.
溪柄碾压混凝土薄拱坝设计采用了仿真的材料热学参数。这些参数是在预测的施工温度条件下进行的材料实验中测定的。
应用推荐