• According to their building material, DAMS are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照筑坝所用材料,可以把坝称为混凝土坝、填土坝、堆石坝,水力冲填坝等等。

    youdao

  • According to the problems above, the waste rock fill mining method with the upward slitting stratification is put forward.

    针对上述主要问题,提出采用上向分条分层废石充填采矿法。

    youdao

  • The first stage earth rock fill cofferdam of Three Gorges Project is mainly composed of the weathered sand, excavated spoil and rock blocks.

    三峡水利枢纽一期土石围堰堰体主要由风化砂、石渣和块石填筑而成。

    youdao

  • With the increasing of thickness of rock fill, the wave force coefficient on the perforated wall generally decreases, while the reflection coefficient increases.

    增加消浪室内填料厚度通常可以降低开孔墙结构的波浪力系数,加大结构的反射系数。

    youdao

  • Finally, the 3-d finite element methods are used respectively to calculate the stresses and deformations of Gongboxia blend dam and Gongboxia face rock fill dam.

    最后,用三维有限元方法分别计算了公伯峡混合坝和单一面板坝的应力变形。

    youdao

  • The cause of concrete fissure on face rock fill dam of Dongba Hydropower Station is studied, and it is determined to use SR sealing material to solve the problem.

    通过对洞巴水电站面板堆石坝混凝土裂缝的原因进行详细分析,确定采用SR止水材料的处理措施。

    youdao

  • A method to measure the density of rock fill by use of the rigidity correlation method is put forward with regard to the characteristics of the rockfill of Yanshan Reservoir.

    针对燕山水库大坝堆石体的特点,提出了刚度相关法测试堆石体密度的思路。

    youdao

  • Seepage failure is one of main causes of earth-rock fill DAMS 'collapse. the property of seepage alleys such as location, size and figure should be ensured to deal with this problem.

    渗透破坏是引起土石坝垮坝事故的主要原因之一,为对土石坝的渗漏问题做出有效整治,必须先探明渗漏通道的位置、大小、形状等性质。

    youdao

  • The paper calculates the deformation and the stress of dam body and face for concrete faced rock fill dam with non-linear finite element method and taking Shenzhujiang model as rock fill body model.

    文中采用非线性有限元分析方法,并运用沈珠江模型作为堆石体本构模型对面板堆石坝坝体及面板做应力和变形计算。

    youdao

  • This model can actually reflect the uncertainties of the rock-fill dam construction, and it gives important guidance to the project-administrating and decision-making.

    该模型能够更真实的反映堆石坝施工过程中的不确定因素,对于施工项目管理和决策有着重大的指导意义。

    youdao

  • Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).

    胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。

    youdao

  • The results indicate the validity of improved PSO methods in the back analysis of the mechanical parameters of concrete face rock-fill dam.

    计算结果表明,微粒群算法具有概念简单、容易实现、计算速度快等优点,适合应用于面板堆石坝坝料参数反演分析。

    youdao

  • Slope construction at upper reach of bedding materials of the concrete face rock-fill dam directly relates to the quality of concrete face, dam construction progress and cost of construction.

    面板堆石坝垫层料上游坡面施工直接关系面板的质量、大坝施工进度及施工成本。

    youdao

  • The reinforcement technology is widely used in rock-fill DAMS in high seismic hazard zones.

    加筋措施在土石坝的抗震加固中得到了较为广泛的运用。

    youdao

  • Cracks are easily caused by different dimension, reinforcing rate and environment conditions in the facing plates of rock-fill-dams and results in decrease of seepage prevention effect.

    堆石坝砼面板极易受其几何尺寸、配筋率及外部环境的影响出现裂缝,从而影响到坝体防渗效果。

    youdao

  • Abstract: Flood water resulted from break of natural rock-fill dam threatens the safety of downstream seriously.

    文摘:天然堆石坝溃决洪水,严重威胁下游的安全。

    youdao

  • However, the simulation software of rock-fill dam construction still remains in a single - development process, and there's a lack of uniform modeling platform.

    但是,目前堆石坝仿真软件的开发还停留在单个工程开发的阶段,缺少一个统一的建模平台。

    youdao

  • In the loose model test, we can not only consider the nonlinear of the earth and rock-fill deformation, but also realize the seepage. The earthquake loadings can be thought as the body force.

    在松散体模型试验中,不仅可以考虑土石变形的非线性,而且可以实现渗流,地震荷载亦可作为体积力处理。

    youdao

  • This paper gives a comprehensive presentation of Yele Hydropower Station rock-fill dam design.

    本文对冶勒水电站堆石坝的设计作了较全面的介绍。

    youdao

  • In most of soil constitutive models, the soil is taken as isotropic material. This may result in significant error in stress and deformation computation for concrete slab in rock-fill dam.

    土体本构模型一般都将土体作为各向同性材料,应用于混凝土面板堆石坝应力变形计算时常带来不小的误差,本文以双曲线模型为例剖析了计算中存在的问题。

    youdao

  • The Gongboxia Hydropewer Project is the fist Concrete Facing Rock-fill Dam in the Yellow River.

    公伯峡水电站工程为黄河干流上的第一座混凝土面板堆石坝。

    youdao

  • Rock-fill concrete is first used in the engineering of Hebei Province, the structure design of this project has a certain representation.

    堆石混凝土材料首次应用于河北省的工程中,其结构设计具有一定的代表性。

    youdao

  • Rock-fill concrete is first used in the engineering of Hebei Province, the structure design of this project has a certain representation.

    堆石混凝土材料首次应用于河北省的工程中,其结构设计具有一定的代表性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定