Coal-rock boring machine is able to achieve cutting, loading, reproduced transport, walking and spray Dust combined unit.
半煤岩掘进机是一种能够实现截割、装载、转载运输、行走和喷雾除尘的联合机组(略)。
Eight have died since construction of the new tunnel began 15 years ago, blasting and boring through 13 million cubic meters of rock in hot and humid conditions.
工程建设了15年,在潮湿、温热的环境中,1300万立方米的岩石被炸开和凿穿,同时也有8位工人因公殉职。
Theregion's unpredictable geology and its volcanic rock prevented engineers from using boring machines, forcing them to blast and dig their way under the Tsugaru Strait.
该地区不可预知的地质环境和火山岩结构迫使工程师放弃使用钻孔机,而是通过爆破在津轻海峡挖掘出一条通道。
Some fans who like rock music think that classical music is boring.
一些球迷认为谁喜欢摇滚音乐,古典音乐很无聊。
The kerf is the outside boundary of the tunnel wall that a boring machine gouges out as it bores through the ground or rock.
切口在隧道壁边界的外面,隧道壁是由钻机在钻透土地或岩石时挖出的。
I think that rock music is too loud, and I think that football is boring.
我认为摇滚音乐太吵闹,并且我认为足球很惹人烦。
A full face rock tunnel boring machine was highly sensitive to geologic situation.
全断面岩石掘进机施工对地质地层状况非常敏感。
Being a crucial factor in influencing the performance of Full Face Rock Tunnel Boring Machine (TBM), the cutterhead design is one of the key issues of TBM.
刀盘设计是全断面岩石隧道掘进机(TBM)的设计关键,是影响其掘进性能的决定性因素。
Correctly determining quality parameters of rock is the theoretical basis of use of TBM (full face rock tunnel boring machine) and its design.
正确确定岩石的性能参数是全断面岩石掘进机使用及高性能全断面岩石掘进机研制的理论基础。
Shields that are modification of the one that Brunel developed for boring the Thames Tunnel are used in excavating through clay or soft rock.
布鲁内尔在挖掘泰晤士河隧道时所发明的盾构加以改进后用于在粘土和软岩地带挖掘隧道。
If I didn't bungee jump, rock climb and sky dive, you'd find me a boring person.
如果我不会弹跳、攀岩和跳伞,你就发现我是个无趣的人。
Breaking rock rolling cutters are cutters of breaking rock with rolling in the way of the push of the cutterhead, they are used widespread in the full face rock tunnel boring machine.
滚动破岩刀具是在刀盘的推压力作用下滚动破碎岩石的刀具,广泛用于全断面岩石掘进机上。
After several years to jumbolter research, the hard rocks always present in the soft ones in the wall rock procedure using jumbolter, which results in changing the boring tool during the procedure.
经过几年对锚杆钻机的跟踪研究,发现锚杆钻机在围岩作业中常遇到软岩中有硬岩夹层的现象,造成施工过程经常更换钻具的问题。
Using artificial intelligence to make a type selection of full face rock tunnel boring machine an intelligent design system was established.
利用人工智能技术对全断面岩石掘进机进行优化选型,实现掘进机方案设计智能化。
So, maybe Mars was not just a dead boring rock.
可能火星不是死亡的无趣的大石头。
Full face rock tunnel boring machine (TBM) becomes more and more important in current tunnel construction.
全断面岩石掘进机施工对地质地层状况非常敏感。
The cutterhead and rock mass characteristics affect the excavation efficiency of full face rock tunnel boring machine (TBM) strongly.
全断面岩石掘进机(TBM)的破岩效率主要受刀盘设计和岩体特征的影响。
In order to rationalize type selection of the full face rock tunnel boring machine, a comprehensive solution substituting the empirical choosing method is presented.
为了使隧道掘进机选型决策理性化,避免单纯依靠设计者的经验进行选型,研究一种综合解决方案。
I am a fan of mountain climbing, rock climbing and trekking but boring traveling days are certainly not my cup of tea, then I manage to set up a camping site on the mountain right behind me.
我喜欢爬山徒步攀岩但不喜欢花大把时间往返奔波,所以我在距离大门口十六级台阶的地方安了个露营区;
Application of Self-boring is a new-type anchor, drilling, installation, bolt grouting andanchoringfor one, is mainly used for anchorage of rock bolting faults.
自进式锚杆是一种新型锚杆,集钻孔、锚杆安装、注浆、锚固为一体,主要用于断层破碎带岩体的支护。
Application of Self-boring is a new-type anchor, drilling, installation, bolt grouting andanchoringfor one, is mainly used for anchorage of rock bolting faults.
自进式锚杆是一种新型锚杆,集钻孔、锚杆安装、注浆、锚固为一体,主要用于断层破碎带岩体的支护。
应用推荐