According to the Yangtze River Basin Development Plan, such two hydroelectric stations should play a certain role in the flood control of Yangtze River.
按照长江流域规划规定,两水电站应承担一定的长江防洪任务。
In this paper, development sequence of the latter two hydropower stations are studied based on current conditions of Baishuihe River Basin development and entire power market condition.
在白水江水电开发现状的基础上,结合整个电力市场,对两个电站开发的先后顺序进行了分析。
In this paper, development sequence of the latter two hydropower stations are studied based on current conditions of Baishuihe River Basin development and entire power market condition.
在白水江水电开发现状的基础上,结合整个电力市场,对两个电站开发的先后顺序进行了分析。
应用推荐