The behavior risk of project main body.
项目主体行为风险分析。
Based on analysis the risk of project, life cycle integrated risk management of project was given.
在分析了工程项目风险的基础上,提出了工程项目全寿命周期风险集成化管理。
In short, writing comprehensive documentation may seem like a safe and comfortable thing to do, but in reality, it increases the risk of project failure.
总之 ,撰写全面的文档似乎是安全且轻松的事情,但事实上,它增加了项目失败的风险。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
Using fuzzy evaluation, risk of project is fully evaluated; At last, using a case, the correction of the risk evaluation system and method of the secondary incubating project proved.
然后,利用模糊综合评价法对项目的风险进行综合评价,最后通过案例证明了该二次孵化项目风险评价体系和评价方法的正确性。
You need to assess all project risks to determine if the projects are within acceptable levels of risk.
您需要评估所有项目的风险,来决定项目是否在可接受的风险范围之内。
According to a study in the latest issue of the Journal of Consulting and Clinical Psychology, the risk of developing eating disorders was reduced 61% among Body Project participants.
根据最新一期《咨询与临床心理学杂志》的一项研究,在“身体项目”参与者中,出现饮食失调的风险降低了61%。
Without Project Hope, there is a risk that a lot of children would have an unhappy future.
如果没有希望工程,很多孩子的未来就可能不幸福。
Of course, for the project to have acceptable risk, this must be done for each of the tasks, leading to almost doubling the duration.
当然,对于拥有可接受的风险的项目来说,必须对每个任务都这样做,这将导致几乎将持续时间加倍。
Risk, by itself, will not threaten the success of a project if it is recognized and addressed in a timely fashion.
如果风险自身被公认为一种适时的方式的话,那么它将不会对项目的成功构成威胁。
In this method, the relationship of risk management and the key project measurements is tenuous.
在此方法中,风险管理和关键项目测量的关系是纤细的。
But each project also has a level of risk associated with it.
但每个项目都会有与其相关的级别的风险。
Risk management is an important part of project management.
风险管理是项目管理的一个重要组成部分。
This form of support can be a risk for big project.
所以对于大型项目来说,这种形式的支持存在风险。
The process of performing data analysis in this SOA context is similar to most data quality initiatives with the goal of reducing project risk and addressing potential gaps.
在这个SOA上下文中执行数据分析的过程类似于大多数流行的数据分析项目,其目标是降低项目风险,消除潜在差异。
The concept of using the iterations in this way to manage project risk is fundamental to the successful adoption of iterative and incremental techniques.
通过这种使用迭代的方法来管理项目风险的概念是成功使用迭代式增量开发技术的基础。
Highlights and issues: Action items and risk mitigation, which are usually necessary within all areas of a project.
突出部分和问题:动作条目和风险降低,这通常对一个项目的所有领域都是必要的。
A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.
我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。
Using this open-source product was a bit of a risk for the project, so we needed be sure it was bulletproof and wouldn't hog resources under heavy use.
使用这个开放源码的产品对于我们的项目是稍微有一点冒险,因此我们需要确保它是仿弹的并且不是严重吞噬资源的。
That expectation is always at risk; the extent of the risk varies according to project characteristics.
该期望总是处于风险中,根据项目特性,风险的程度各不相同。
This phased approach means that the cost-to-benefit ratio isn't rosy either, and unless the head team can deploy aggressively and successfully, the project is at risk of being shut down.
分阶段方案意味着效益成本比也并不乐观,除非主管团队能积极推广并获得成功,否则项目也存在着关张的风险。
Some attention should be given to choosing the required rate of return to make sure that it adequately accounts for the risk of the project.
我们应该慎重选择这个要求回报率 以此确保充分考虑这个项目的风险。
Risk is a manifestation of the likelihood of unexpected things happening to the project, and risk stands in the way of value creation.
风险是指项目中发生的预期之外的事情,以及价值创造道路上的风险。
In particular, most of the project value is created in the early stages, when most of the risk is removed.
特别地,在大量减少风险时,大部分项目价值在早期阶段生成。
This can help reduce the risk of the project and may also reduce resource requirements, a combination of which can bring down the price of the bid.
这有助于减少项目风险,并可能降低资源需求,这两者结合起来,可以降低竞标价格。
The linkage between systematic reduction of variance in reducing project risk.
系统变化的降低于项目风险的降低之间的联系。
Figure shows risk reduction and value increase over course of project.
项目周期期间的风险降低(红色曲线)和价值创造(绿色曲线)。
Following the Datar, Mathews method, the value of the project increases as the risk is removed.
遵照Datar、Mathews方法,随着风险的去除,项目价值也增加了。
A measure of risk removed, i.e., the reduction of variance of key project metrics.
去除的风险测量,即,减少关键项目度量标准的方差。
We didn't follow it to the letter because we wanted to avoid the risk of "process shock" to the project team through too many new steps.
我们没有完全的照搬 RUP的内容,因为我们想避免对于项目团队通过太多新的步骤所带来的“过程工作”的风险。
应用推荐