Analyzing an axially loaded column derives the relation between risk cost and structure reliability index.
通过对轴心受压构件的分析,给出风险损失与结构可靠指标之间的定量关系。
Reverse engineering is the root of the hell project, and it is also the root of the risk cost of the reengineering.
逆向工程是维护“地狱”的根源,即再工程风险成本的来源。
Then, based on minimizing risk cost and considering actual conditions, the author studies some approaches of risk control and management.
再次,本文从风险成本最小化的宗旨出发,结合我国的实际情况,考虑一系列的风险控制和管理手段。
In this paper, we propose a method of appraisal and selection alternative by calculating and comparing the risk value and risk cost of the alternative.
本文提出了一种通过对决策方案风险价值与风险费用的计算和比较来评价选择方案的方法。
The total cost of the customer includes monetary cost, risk cost, spiritual cost, opportunity cost, evaluation index to form customer satisfaction of e-commerce.
顾客总成本包括时间成本、货币成本、风险成本、精神成本、机会成本、构成了电子商务顾客满意度的评价指标。
This paper has put forward a credit quality management mode based on risk adjusted return of capital through a beforehand estimate and drawing of risk cost of every credit capital.
通过事前计提每笔信贷资产的风险成本,提出了基于风险调整后的资本收益率的信贷质量管理模式。
The extensions are in two aspects, one considering the restriction of transit capacity and putting forward congestion risk cost, the other treating the disturbance between private cars and transit.
扩展包括两个方面,一是考虑公共交通输送能力的限制,提出了拥挤风险费用;二是考虑到私人小汽车与公共交通方式的相互干扰,使模型更加符合实际情况。
The research result shows that, whether under non-cooperation or integration conditions, the lot-size of considering quality risk cost is always smaller than that of not-considering quality risk cost.
研究结果表明,无论在非合作还是在一体化的情况下,考虑质量风险时的订货批量都比不考虑质量风险时的批量小。
Nevertheless, there are some actions that offer much and carry little risk or cost.
尽管如此,还是有一些措施能够带来很多好处,同时,风险和成本也较低。
She noted, many young people are especially risk averse at school—afraid that one low test score or mediocre grade could cost them a spot at a selective university.
她指出,许多年轻人尤其不愿意在学校冒险,担心一次考试的分数低或成绩差会让他们失去进入名牌大学的机会。
Be hyperconservative when it comes to downside risk, hyperaggressive when it comes to opportunities that cost you very little.
当出现滑坡风险时要极其保守,当需要极少资金投入的机会出现时要十分积极主动。
In any case he declares that point as a "risk." Not a cost.
在任何情况下,他都把那个点声明为“风险,而不是成本。”
Project management: Cost, schedule, risk, staffing, and so forth.
项目管理:成本、时间表、风险、人员分配等等。
Archiving before an upgrade or consolidation speeds up the process, reduces risk, and reduces cost.
在升级和合并之前进行归档能够加快处理速度、降低风险和节约成本。
Remember, the risk and cost of porting a mainframe application is not limited just to the ported application.
请记住,移植大型机应用程序的风险和成本不仅限于所移植的应用程序。
Once you have performed the steps listed above, you can then determine appropriate tradeoffs of risk versus cost.
一旦完成以上列出的步骤,您就可以对风险对抗成本做出适当的权衡。
It is also a tenet of an agile, iterative methodology, representing a significant improvement over waterfall in terms of risk, cost, quality, and efficiency.
这还是敏捷、迭代的方法的宗旨,表现出就风险、成本、质量,和效率而言,在瀑布模型上的重大改善。
You reduce risk and cut cost, without jeopardizing data retention compliance.
您可以在降低风险和节约成本的同时保护数据。
Because of this transition to a broader, NATO-based coalition, the risk and cost of this operation - to our military and to American taxpayers - will be reduced significantly.
由于移交给了一个更广泛、以北约为基础的联盟,这一行动的风险和代价——对我军和美国纳税人——将大大减小。
Because of this transition to a broader, NATO-based coalition, the risk and cost of this operation — to our military and to American taxpayers — will be reduced significantly.
由于移交给了一个更广泛、以北约为基础的联盟,这一行动的风险和代价——对我军和美国纳税人——将大大减小。
Understanding and gaining agreement on project objectives, deliverables, scope, risk, cost, approach, etc.
理解项目目标、可交付物、范围、风险、成本、方法并且达成一致。
Outsourcing firms are moving into more countries in order to deliver the right mix of cost, risk and quality.
为了达到成本,风险,质量的正确组合,外包公司进驻越来越多的国家。
Approaches for creating a test environment vary in cost, planning, and risk.
创建一个测试环境的各种方法的成本、规划和风险都不相同。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
If they accept some risk, the price of financing facilities drops, but total spend is uncapped; if utility firms carry all the risk, the cost of borrowing will rise.
如果他们接受一些风险,建造核电站的借款成本将下降,但总支出难以控制,如果公共设施服务商承担了所有的风险,借款成本将上升。
Third, it would come at minimum cost and risk to the taxpayer.
第三,纳税者承担的成本和风险应该最小。
Third, it would come at minimum cost and risk to the taxpayer.
第三,纳税者承担的成本和风险应该最小。
应用推荐