Manage resource – This interface provides a method to schedule the resources in the pool.
管理资源 –该界面提供一种方法来调度资源池中的资源。
Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resource leveling, and critical chain methods.
在这一步中所用到的工具包括:关键路经法,计划压缩,what-if脚本分析,资源水平,关键链。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。