Resource schedule is a key technique and an important research field of streaming media system.
在流媒体技术中,资源调度问题是流媒体系统的关键技术和重要研究方向。
Traditional research on grid resource schedule attaches importance to the performance, but rarely considers the quality of service.
传统的网格资源调度研究注重调度的性能,很少考虑调度的服务质量。
Different resource scheduling algorisms are designed for different computing expectation in order to achieve flexible and efficiency grid resource schedule.
针对不同的“计算期望”,设计了不同的资源调度算法,以实现高效,灵活的网格资源调度。
The bottom line is clear: We've created a foreseeable and avoidable bottleneck on the resource and a delay in the schedule.
底线是很清晰的:我们在资源上创建了一个可以预见的、可以避免的瓶颈和一个时间计划上的延迟。
I still feel that the orange resource — Step 3a — is a potential bottleneck, so I schedule a two-day buffer before the potential bottleneck.
我仍然可以感觉到“桔红色”资源——步骤3——是一个潜在的瓶颈,所以我在潜在的瓶颈之前安排了两天缓冲时间。
Manage resource – This interface provides a method to schedule the resources in the pool.
管理资源 –该界面提供一种方法来调度资源池中的资源。
The resource kernel can then merge the requests to define a schedule to provide guaranteed access using the task-defined constraints (or return an error if they cannot be guaranteed).
然后资源内核可以合并这些请求,使用任务定义的约束定义一个调度,从而提供确定的访问(如果无法提供确定性则返回错误)。
Tools used in this process include critical path method, schedule compression, what-if scenario analysis, resource leveling, and critical chain methods.
在这一步中所用到的工具包括:关键路经法,计划压缩,what-if脚本分析,资源水平,关键链。
Scenarios allow the user to select a portfolio of projects and compare and change project scenarios to assess the impact on the overall schedule, cost and resource utilization.
适用的场景为,允许用户选择项目的项目组合,并进行比较和改变项目场景来评估对整个进度表、成本和资源利用的影响。
A TAB labelled Resource Monitoring contains the configuration parameters that are used when the schedule in context is executed.
标有ResourceMonitoring的选项卡包含了当执行上下文中的进度表时所使用的配置参数。
Performance Tester has the ability to collect from ITM monitoring agents, in real-time, without having to configure a resource location through a performance schedule.
在不用通过性能进度表配置资源位置的情况下,Performance Tester具有实时地从ITM监控代理那里收集数据的能力。
To configure resource monitoring using Windows performance monitor, create a new or add an existing location to a given performance schedule.
要使用WindowsPerformanceMonitor来配置资源监控,就要在已知的性能进度表中创建新的或添加现有的位置。
The WorkManager lets a resource adapter schedule work for synchronous or asynchronous execution on an application-server thread.
WorkManager允许资源适配器对工作进行调度,在应用服务器线程上同步或异步执行调度。
The Data Source table in the Resource Monitoring tab displays the configured data sources that are collected from when this schedule executes.
ResourceMonitoring选项卡中的DataSource表展示了,当执行该进度表时,收集的数据所来自的配置的数据源。
After the resources information is set and associated with a room Reservation database and Domino Directory, you can search for the free time of a room and a resource, and schedule them for a meeting.
当设置了资源信息并与RoomReservation数据库和DominoDirectory进行关联后,就可以搜索会议室和资源的空闲时间,并为会议安排会议室和资源。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Once the statement of work and the resource list have been created, the project manager should build a project schedule. This is usually done in several steps.
工作说明和资源列表一旦创建完成,项目经理就应该制定项目进度计划。通常分以下几步。
Ignore invalid resources when executing the schedule: Select this check box to suppress error messages about resource monitoring data sources.
Ignoreinvalidresourceswhenexecutingthe schedule:选择该复选框来禁止关于资源监控数据源的错误消息。
Interviews: You prepare a list of local resource people and schedule times for them to meet with the panel.
访谈:请您准备一份当地重要人士的名单并安排其同顾问团见面的时间。
The system architecture, application program structure design, tasks dynamic schedule strategy and system resource dispatching are presented.
给出了控制系统结构、应用系统结构设计和任务动态调度策略及系统资源分配原则。
This is the process necessary for analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
这是分析活动顺序、持续时间、资源要求,以及进度制约因素和制定项目进度表所必需的过程。
Write a test plan, including test methodology, lab and test resource requirements, and schedule.
编写测试计划,包含测试方法、实验室和测试资源需求,以及日程安排。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Test management tools are essential to facilitate effective resource usage, feasible process schedule and systematical activity organization.
管理工具有助于有效利用测试资源、合理安排测试流程、系统组织测试活动。
Performance results include such measurements as resource utilization, resource availability, product unit cycle time, conformance to schedule, and performance to standards.
性能测试结果,绩效包括资源的利用情况,资源供应,生产单元节拍时间,排程符合性和与标准的比较。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
We propose new float definitions that retain the original meaning while accounting for the effect of resource on the schedule.
提出了新时差的定义,它包含了最初的意义同时考虑了资源对项目计划的影响。
To solve this problem, resource management and task schedule is proposed in the network management and realized in a new object-oriented network management protocol MNMP.
为此,在针对卫星综合信息网网络管理的研究中,提出了关于网络资源管理和任务调度的概念,并在卫星综合信息网的管理协议MNMP中定义了相应的实现过程。
To solve this problem, resource management and task schedule is proposed in the network management and realized in a new object-oriented network management protocol MNMP.
为此,在针对卫星综合信息网网络管理的研究中,提出了关于网络资源管理和任务调度的概念,并在卫星综合信息网的管理协议MNMP中定义了相应的实现过程。
应用推荐