Average resource requirements for software developers.
软件开发人员的平均资源需求。
Average resource requirements for production environment.
生产环境的平均资源需求。
Average resource requirements for software assurance engineers.
软件保障工程师的平均资源需求。
The resource requirements are just as noticeable as the speed difference.
资源需求与速度差别一样明显。
It really depends on the application's value to the business and resource requirements.
这实际上取决于应用程序对业务的价值和资源需求。
Production resource requirements.
生产资源要求。
Identify internal audit resource requirements.
识别内部审计资源需求。
Understand the resource requirements and functions that are associated with team projects.
了解与团队项目关联的资源需求和功能。
The resource requirements for each virtual machine are specified with a virtual server template.
每个虚拟机的资源需求通过虚拟服务器模板指定。
Write a test plan, including test methodology, lab and test resource requirements, and schedule.
编写测试计划,包含测试方法、实验室和测试资源需求,以及日程安排。
The staffing and resource requirements, which are shown in tables 8 and 9 respectively, are indicative.
分别列于表8和表9的人员配备和资源需求是指示性的。
Others are looking to reduce system resource requirements by using "mashup" applications or outsourced hosting.
其他公司则试图通过使用“mashup”应用程序或外包托管来减少对系统资源的需求。
Due to their lightweight design and modest resource requirements, they are also well suited for the embedded space.
得益于其轻量化的设计和较少的资源需求,它们也非常适合于作为嵌入式组件使用。
All we need to provide to the IT staff is the virtual disk files and resource requirements for our virtual machine.
我们只需向IT人员提供我们的虚拟机的虚拟磁盘文件和资源需求。
When set to automatic, DB2 automatically adjusts these parameters to reflect the current resource requirements for the system.
当设置为自动时,DB 2自动调整这些参数,以满足系统当前的资源需求。
You must also look at any other Domino feature, add-in function, or third-party product that can impact resource requirements.
还必须考虑可以影响资源要求的其他任何Domino特性、附件功能或第三方产品。
Create a summary of the initiatives (projects), business value of the initiative, duration, rough cost, and resource requirements.
创建活动(项目)、活动的业务价值、持续时间、大致成本和资源需求的摘要。
Work with SPM to manage system change requests, identify resource requirements, and assist in monitoring project deliverables;
与SPM合作处理系统升级的需要,确定所需资源,并协助监测项目成果。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Baseline Comparison system is very important in studying manpower, personnel and training resource requirements of new weapon systems.
基准比较系统对于新武器系统人力、人员和训练资源需求的研究非常重要。
In most environments, moderate change is expected and usage patterns, resource requirements, and integration requirements can be anticipated.
在大多数环境中,可以预期会发生较为缓和的变更,而且能够预见使用模式、资源需求和集成需求。
This can help reduce the risk of the project and may also reduce resource requirements, a combination of which can bring down the price of the bid.
这有助于减少项目风险,并可能降低资源需求,这两者结合起来,可以降低竞标价格。
This is a detailed work scope based on the maintenance requirements, routes and resource requirements in terms of man-hours by skill, tools and material.
这是一个基于维护需求、作业路线以及技能工时、工具和材料资源需求的详细工作范围。
Improved suspend and resume read support by auto detaching and reattaching the socket's SelectionKey to the Selector, which reduces the resource requirements.
通过自动分离、重新连接Socket的SelectionKey到Selector来提升挂起和恢复读支持,这能减少所需的资源。
This is the process necessary for analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
这是分析活动顺序、持续时间、资源要求,以及进度制约因素和制定项目进度表所必需的过程。
In general, a partition profile specifies operating system boot time resource requirements, such as the desired amount of memory, processor entitlement, adapters, and so on.
通常,分区配置文件指定了操作系统启动时的资源需求,例如内存数量、处理器权限、适配器等等。
Not requiring a database server makes Pebble more lightweight in terms of system resource requirements than most other blog servers, but it also simplifies tasks such as backups.
不需要数据库服务器使Pebble在系统资源需求方面比其他博客服务器更加轻量,它也简化了备份等任务。
Human resource requirements for this M&E system are relatively minimal, in that most of the data collection and management activities are the responsibility of current staff.
本监督评价框架需要的人力资源相对较少,因为大多数的数据收集和管理活动是当事人员的本职工作。
On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.
为了快速、准确地获得最佳的主生产计划,在分析主生产计划系统中关键问题的基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构。
On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.
为了快速、准确地获得最佳的主生产计划,在分析主生产计划系统中关键问题的基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构。
应用推荐