Based on this research, this paper proposed the on-line tasks reservation rescheduling algorithm.
在此研究基础上,本文提出了在线任务预约重调度算法。
The generator cost increased least after generation rescheduling to meet high stability requirements in New England test power system, which shows effectiveness of the algorithm.
新英格兰测试系统的分析结果表明,在系统总发电成本增加最小的情况下,系统的稳定程度已提高到设定的目标,证明了该算法的有效性。
The generator cost increased least after generation rescheduling to meet high stability requirements in New England test power system, which shows effectiveness of the algorithm.
新英格兰测试系统的分析结果表明,在系统总发电成本增加最小的情况下,系统的稳定程度已提高到设定的目标,证明了该算法的有效性。