While the integration test client does not yet have full-featured test case support, it does allow you to save and rerun tests.
虽然集成测试客户端尚不具有功能齐全的测试用例支持,但它确实可以让您保存并重新运行测试。
重新运行此测试。
We repeat the test suite for each of our storage layers. Again we rerun those test cases 2 times: once to test Transaction Log recovery and then to test Regular Shutdown.
我们会对每个存储层重复执行该测试套件,并且会重新运行这些测试用例2次:一次是测试事务日志恢复,然后测试常规的关闭。
This "write a test, write just enough code to get it to pass, rerun the test" approach is the xp development flow that you should experience every day.
这种“编写一个测试,编写足够的代码来使测试通过,重新进行测试”方法是您每天都在经历的XP开发流程。
RUP defines the AT insufficiently, merely as a rerun of a subset of the st test cases.
RUP定义验收测试不够充分,只是作为系统测试用例子集的重新运行。
Rerun the test, with all other components of the example remaining the same. The result is a catastrophic test failure, as shown below.
重新运行测试,并且示例的所有其他组件保持不变。
Whether you are using an existing integration test client, or you have opened a saved one, to re-run a test, right-click an Invoke event and choose either Rerun or Rerun with auto-emulate.
无论您使用现有的集成测试客户端,还是打开保存的集成测试客户端,要重新运行测试,请右键单击调用事件,并选择Rerun或Rerun with auto - emulate。
To test that changes in the Ecore model are being reflected in the viewer, we will simply rerun our application and start making some changes.
要测试ecore模型中的更改在查看器中得到了反映,我们将只需重新运行应用程序并开始做出更改即可。
If test cases that were run before will need to be rerun for this iteration, just tag these test cases with the new iteration to identify them as Planned.
如果测试用例在此之前已经运行过的话,那么需要在这次迭代中重新被运行,只需将这些测试用例标注为Planned用以识别它们。
To open a saved test, click the load icon on the top tool bar, browse to the project that contains your test files, and then select the.exetrace file for the test that you want to rerun.
要打开保存的测试,请单击顶部工具栏上的加载图标,浏览至包含测试文件的项目,然后为需要重新运行的测试选择.exetrace文件。
Later, when the emulated component is functioning, you can rerun the test after removing the emulator from the configuration.
随后,在模拟组件发挥作用时,您可以从配置中删除模拟器,然后重新运行测试。
Any unsuccessful test needs to be rerun.
需要重新运行不成功的测试。
Get the test to compile by adding the do-nothing withdraw method to Account, then rerun the tests.
通过向Account增加do - nothingwithdraw方法来使测试进行编译,然后重新运行测试。
Additionally, rerun the Design Advisor against the dynamic SQL cache populated by a full scale application test.
此外,针对由完整应用程序测试填充的动态sql缓存重新运行Design Advisor。
Once you've rerun the test to ensure that it passes, it's time to tackle a slightly more tricky constraint: unique.
在重新运行测试以确保其通过时,可以解决一个稍微棘手一些的约束:unique。
Repeat Steps 5 and 6 to rerun the JUnit test.
重复第 5步和第 5 步,重新运行JUnit 测试。
Its flexibility is especially useful with large test suites, where one test's failure shouldn't mean having to rerun a suite of thousands.
对于大型测试套件,我们不希望在某一项测试失败时就得重新运行数千项测试,TestNG的灵活性在这里尤为有用。
The ability to rerun failed tests is especially handy in large test suites, and it's a feature you'll only find in TestNG.
在大型测试套件中,这种重新运行失败测试的能力显得尤为方便。这是TestNG独有的一个特性。
The base line is only relevant if the entire test scenario can be consistently reproduced (i.e. you can always rerun the base line and get the same results back).
仅当整个测试情景可被一致地再次产生时(也就是说,您总是可以再次运行基线并获取相同的结果。)基线才是有关的。
In JUnit 4, if your test suite consists of 1000 tests and 3 of them fail, you'll likely be forced to rerun the entire suite (with fixes).
在JUnit4中,如果测试套件包括1000项测试,其中3项失败,很可能就会迫使您重新运行整个测试套件(修改错误以后)。
If you run your automated tests by using a test plan, you can view your testing progress and easily rerun your tests as required.
如果您在使用测试计划执行自动化的测试可以检视您的测试进度,并轻松地重新执行您所需的测试。
You can rerun all tests or a selection of the tests that were run in the last test run.
您可以运行在上一个测试运行中运行的所有测试或选定的测试。
If you changed the code under test or the code of your tests, this action does not rerun the same versions of that code that you ran the previous time.
如果更改了测试代码或测试的代码,此操作不会重新运行上次运行代码时的同一版本。
如何:重新运行测试。
如何:重新运行测试。
应用推荐