How to optimize the reorder point and order quantity is a difficult problem for slow moving spare parts with high cost and long storage time.
对价值高的慢速流动备件,如何确定其最佳再订货时间和订货批量,这是目前困扰企业的一个急需解决的问题。
The objective is to simultaneously optimize the order quantity, reorder point, back-order discount and lead time.
我们祈以计量方法推导出使期望总相关成本最低之最适订购量、请购点、欠拨折扣及前置时间。
The objective is to simultaneously optimize the order quantity, reorder point, back-order discount and lead time.
我们祈以计量方法推导出使期望总相关成本最低之最适订购量、请购点、欠拨折扣及前置时间。
应用推荐