• In order to estimate the reliability of surface area measurement, interval estimation must be given together with point estimation.

    为了对比表面测定结果的可靠性作出估算,除了给出点估算值外,还应同时给出区间估算直。

    youdao

  • For the case of the reliability statistical test which is a small sample, this paper presents disadvantages of point and interval estimation of classical reliability.

    本文针对小子样可靠性统计试验的特点,指出经典可靠性点估计和极大似然区间估计的不足。

    youdao

  • For dynamic reliability analysis of stochastic structures under non-stationary random excitation, a new dynamic reliability assessment method is presented based on the point estimation.

    针对随机结构在非平稳随机激励下的动力可靠性分析问题,提出了基于点估计法的随机结构动力可靠性分析方法。

    youdao

  • Our analysis suggests that if a change-point exists in a testing process, it should be considered in creating a software reliability estimation model.

    分析表明如果在一测试过程中存在一个或多个变点,那么变点是应该在创建一个软件可靠性估计模型时考虑进去的。

    youdao

  • The key point of solving this problem is to give an estimation procedure to set up the relationship between aseismic structural investment and its reliability.

    解决这个问题的关键,是给出了抗震结构的造价和可靠度间函数关系的估计方法。

    youdao

  • The key point of solving this problem is to give an estimation procedure to set up the relationship between aseismic structural investment and its reliability.

    解决这个问题的关键,是给出了抗震结构的造价和可靠度间函数关系的估计方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定