The impregnation of resin for fiber reinforcement process is a very important phase in RTM.
RTM成型过程中,树脂对纤维增强体的充分浸润是非常重要的一环。
The monitoring system, the contents and measures of soil grouting reinforcement process were studied according to condition of project.
依据具体的工程条件,研究了注浆加固过程控制的监测系统、控制内容和实施方法。
The cause of the fatigue failure is analyzed by actual measurement and FEM analysis. The reinforcement process methods and the design account for the fatigue failure are presented.
通过实际测量和有限元计算,分析了产生疲劳破坏的原因,提出了针对这种疲劳破坏的加固处理方法和在设计上应采取的措施。
The corrosion principle of anchor bolt was analyzed, and the engineering protection measures adopted in rock and soil reinforcement process for the anchor bolt were also discussed.
对锚杆锈蚀原理进行了分析,并探讨了锚杆在岩土加固过程中所采用的工程防护措施。
In order to acquire good combination of new and old materials in reinforcement process some proper measures are adopted in construction to enhance the shear ability and impermeability.
为了使加固混凝土结构中新旧材料能共同工作,施工时应采取适当措施,以提高结合面的抗剪能力和抗渗能力。
In order to acquire good combination of new and old materials in reinforcement process some proper measures are adopted in construction to enhance the shear ability and impermeability.
为了使加固混凝土结构中新旧材料能共同工作,施工时应采取适当措施,以提高结合面的抗剪能力和抗渗能力。
应用推荐