Pull the 1 inch Manila rope inside the derrick and feed and reeve through the first crown sheave.
把一寸的棕绳穿过天车上的第一个滑轮,在井架内拉该棕绳。
Reeve the 1 inch Manila rope through the first crown sheave.
把棕绳穿过天车上的第一个滑轮。
Next, reeve the 1 inch Manila rope through the fast line sheave and pull back to the drawworks drum.
下一步,把棕绳穿过天车上的快绳轮,再拉回到绞车辊筒。
From the crown sheave, manually pull and reeve the 1 inch Manila rope through the first sheave of the traveling block.
用人力把棕绳从天车轮上拉过来,再穿过第一个游车轮。
From the crown sheave, manually pull and reeve the 1 inch Manila rope through the first sheave of the traveling block.
用人力把棕绳从天车轮上拉过来,再穿过第一个游车轮。
应用推荐