Adopt iterative development practices that reduce project risk.
采取些减少项目风险的反复开发实践。
This resultant analysis can be used to reduce project risk and cost as well as to provide more accurate scoping of the project.
这个分析过程可以减少项目风险和成本,并提供更准确的项目范围。
The iterative approach, combined with early prototypes, demonstrations, and heavy customer involvement, all helped reduce project risk.
迭代的方法,早期的原型、演示和大量的客户参与的合并,所有的这些可以帮助降低项目的风险。
Sound practices in this area can help you reduce project risk, ensure regulatory compliance, and keep your project running smoothly from start to finish.
这方面的经验可以帮助你降低项目风险,确保项目运行顺畅。
Good requirements and analysis practices help reduce project risk and keep your project running smoothly until the final product is successfully delivered to your customer.
好的需求和分析实践能够有助于降低项目风险并使得项目很好的运行直到最终产品成功地发布给客户。
While we say that the value of the iterative approach is to reduce project risk over time, reinforcing this message with the right measurements enables the team to put this into action.
我们说迭代方法的价值在于降低项目风险,因此利用争取的度量加强管理使团队能够将其付诸于行动之中。
To gain support for the project, Enbridge has promised to use tugboats and double-hulled tankers with local pilots to reduce the risk of leaks.
为了表示对项目的支持,安桥公司已承诺使用配备有当地的领航员的拖船和的双壳油轮,以减少原油泄漏的风险。
He also suggests risk mitigation strategies so as to reduce the overall risk for the project.
他还会就风险管理策略提出建议,以降低项目的总体风险。
This can help reduce the risk of the project and may also reduce resource requirements, a combination of which can bring down the price of the bid.
这有助于减少项目风险,并可能降低资源需求,这两者结合起来,可以降低竞标价格。
Furthermore it guides the next step system design and development in the collaborated environment to reduce the project risk.
而且,它将指导在协作环境中的下一步系统设计和开发工作,从而减少项目风险。
An iterative process allows the development team to better accommodate change, to obtain feedback and factor it into the project, to reduce risk early, and to adjust the process dynamically.
一个反复的过程允许开发团队更好地适应变化,获得反馈并将它分解到项目中去,从而尽早地减少风险,动态调整过程。
This approach helps increase the quality of all project-related work products and reduce the risk that team members will not collaborate effectively.
这种方法可以增强所有相关工程产品的质量,并且减少了团队成员无法有效沟通的风险。
How to reduce management risk deserves attention throughout the process of the project establishment.
如何减少管理风险亦是本项目建设过程中必须予以关注的。
Through introducing management consulting, strengthens the project training and strengthens construct of the group, to reduce the human resources risk that enterprises implement erp project.
通过引入管理咨询、加强项目培训工作以及加强实施团队的假设,降低企业实施ERP项目的人力资源风险。
The review activity in the process of product development will play a great role to ensure the project schedule, product quality and reduce the risk of development.
型号研制中的评审活动对于保证工程进度和质量以及降低研制风险起着至关重要的作用。
Using new project data obtained from the process of software development, it can continually predict risks, identify sources of risks, and take proper measure to reduce risk occurrence probability.
随着软件项目的进行,该风险管理模型能够利用不断更新的项目数据持续地预测潜在风险,确定风险源并采取适当的应对措施降低风险发生概率。
Objective to control and reduce intensity of occupational risk factors and protect workers health through determining and assessing occupational risk factors for the construction project.
目的通过对建设项目职业病危害因素测定评价,控制和降低职业病危害因素浓度(强度),保护劳动者健康。
To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
为了降低由进度安排不当导致项目实施失败的风险,将时间约束网络应用到项目实施进度计划研究中。
In addition we can through increase project risk managerial ability, merit of project manager, reduce or remit the risk factor too.
另外,我们也可以通过增加项目风险管理能力、风险应对或承受能力、项目管理成员素质来减免风险因素。
At last one certain project risk is identified and managed and the scenario planning is used. By the example it is showed that the way can reduce project uncertainty in faith.
最后,对某项目的风险进行了识别和管理,并运用情景规划方法进行分析,通过事例说明该方法确实可以减少项目的不确定性。
Acoording to the result of risk evaluation, the risk control strategies and system are researched and supposed for Guangwang Road Project, which can effectively help to reduce and avoid risk loss.
基于风险评估结果,系统地研究广旺公路建设项目风险应对策略,并建立相应的风险控制体系,从而为项目建设中有效规避和控制风险提供直接指导。
The overall risk profile for the project must be considered when you decide when to take action to reduce the probability or mitigate the impact of risks.
当您决定何时采取行动来减少机率或是降低风险的冲击时,必须考虑专案的整体风险设定档。
Using the technology, we can reduce treatment risk, make sure the treatment completed in scheme, adjust the project in oil field work, and advance the treatment quality and effect.
应用该技术,可以减少施工风险,保证施工按压裂设计的要求顺利进行,并根据现场实际情况进行调整,提高施工水平和效果。
More often, though, we'll want to contemplate actions that will either minimize the likelihood of the risk turning into a problem, or reduce the negative impact of that problem on our project.
或者,我们可以选择简单的承担风险并且采取具体行动来避免或将它最小化。
More often, though, we'll want to contemplate actions that will either minimize the likelihood of the risk turning into a problem, or reduce the negative impact of that problem on our project.
或者,我们可以选择简单的承担风险并且采取具体行动来避免或将它最小化。
应用推荐