• We can get the numerical answer meeting the needs of engineering, solve problems with construction, shorten the period and reduce the cost of design .

    利用有限元分析程序可以得到满足工程要求数值解,解决工程中的结构分析问题缩短设计周期降低设计成本

    youdao

  • Building steel structure can shorten the construction period, reduce the energy and material consumption to achieve cost saving purpose.

    结构建筑可以通过缩短建设工期减少能源材料消耗达到节省费用的目的。

    youdao

  • It shows that this method is efficient to shorten the construction period and reduce the cost of projects.

    证明强夯对提高建设速度、降低工程造价作用显著。

    youdao

  • In the construction of tidal power plants, the floating caisson method may reduce the cost shorten the construction period, and improve construction conditions.

    潮汐电站建设中,施工起着降低造价缩短工期,改善施工条件等重要作用。

    youdao

  • Economies are small footprint, easy to move, in-depth load center, short construction period, reduce waste and so on.

    在经济上具有占地面积小,移动方便深入负荷中心建设周期减小浪费优点。

    youdao

  • Practice showed that advanced project control can reduce cost, shorten construction period and increase wo...

    实践证明先进项目控制有助于降低成本缩短建设工期提高工作效率。

    youdao

  • Practice showed that advanced project control can reduce cost, shorten construction period and increase wo...

    实践证明先进项目控制有助于降低成本缩短建设工期提高工作效率。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定