Aiming at the problems that exist in maintenance decision of chemical water treatment system for power plant, this paper put forward a condition based maintenance decision method based on RCM.
针对当前电站化学水处理系统维修决策存在的问题,论文给出了基于RCM的状态维修决策方法。
However, in RCM analysis process, to establish a standard model, it will be much more extended and thorough to apply RCM analytic method into various fields.
然而,在RCM的分析过程,若建立一套标准的分析模型,便可更为广泛和深入的将RCM分析方法应用于在各领域。
Experimental results show that alternating current method and RCM have wide applications since both them can evaluate chloride penetration in concrete conveniently and accurately.
试验结果表明,《规程》中的交流电法和RCM法可以便捷准确的评定混凝土中氯离子的渗透性,有广阔的应用前景。
The general procedure of RCM and the method to calculate the flow field of blast wave simulator are presented herein briefly.
本文简要地介绍了随机选取法的一般过程及计算爆炸波模拟器的方法。
The paper carries out detailed analysis on RCM theory and method, suggest the maintenance and manage scheme based on RCM theory.
论文对RCM理论和方法进行详细分析,提出基于RCM的设备维修管理方案。
Compared to Roll and Column Method (RCM), this new fast algorithm reduces half of multiplication times, eliminates transposition of data, and retains computational complexity of addition.
相对于行列分解法,该算法节省了约一半的乘法次数,省略了数据的转置存储过程,而加法的运算复杂度基本维持不变。
Compared to Roll and Column Method (RCM), this new fast algorithm reduces half of multiplication times, eliminates transposition of data, and retains computational complexity of addition.
相对于行列分解法,该算法节省了约一半的乘法次数,省略了数据的转置存储过程,而加法的运算复杂度基本维持不变。
应用推荐