• In order to test the working ability of the equipment under rated load, the load test can be carried out according to the percentage increasing mode of the design center.

    小型加工中心负荷试验主要是为了检验设备额定负荷工作能力,负荷试验加工中心设计功率的百分比递增方式顺序进行

    youdao

  • Test results have indicated that under rated load, the heat efficiency of the new burner is 30 ~ 50% higher than that of the ordinary ones.

    测定结果表明这种燃烧器额定负荷热效率目前常用的燃烧器提高30—50%。

    youdao

  • To selection of the optimum type transposition from the test results at rated load and overload operation are compared and analyzed in the paper.

    比较分析了在额定超发工况下的试验结果,以便按照具体情况选择最佳方案

    youdao

  • After the improvement, the stable combustion test load without firing oil is as low as 45% of rated load, which greatly enhanced the ability of in depth peak load cycling.

    改造试验负荷达到了45%,大大提高了锅炉深度调峰能力

    youdao

  • After the improvement, the stable combustion test load without firing oil is as low as 45% of rated load, which greatly enhanced the ability of in depth peak load cycling.

    改造试验负荷达到了45%,大大提高了锅炉深度调峰能力

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定