The calculation of the operational reliability is applied to Shanghai Rail Transit Line 1, Line 2 and Line 3.
应用该方法计算了上海轨道交通1、2、3号线的可靠性指标。
The Qiaokoulu depot in the first stage of Wuhan rail transit line 1 is the first elevated depot of urban rail transit in China.
武汉市轨道交通1号线一期工程的硚口路车场及综合维修基地是我国目前城市轨道交通车场设计中首次采用的高架车场。
The realization scheme of digital dispatch system in the first stage of Wuhan rail transit line 1 is introduced, and its function is described in detail.
主要介绍数字调度系统在武汉轨道交通1号线一期线路中的实现方案,并就其功能实现做了较详细的说明。
It is learned that the Wuhan Metro Line No. 1 was regarded as the longest light rail transit system in China.
据了解,武汉轨道交通1号线被誉为国内最长轻轨。
It is learned that the Wuhan Metro Line No. 1 was regarded as the longest light rail transit system in China.
据了解,武汉轨道交通1号线被誉为国内最长轻轨。
应用推荐