A calculation is made. to the radial feed kinematic link, it also gives the calculated result for change gear.
文中对机动径向进给运动链进行了换置计算,并给出了换置挂轮的计算结果。
The existing link connection mode planning is a re-optimization of the tie lines based on radial lines, making local defects inevitable.
现有的有关联络接线的规划都是在已完成辐射线路布局的基础上进行的联络线再优化,这样就不可避免地存在局部性的缺点。
The existing link connection mode planning is a re-optimization of the tie lines based on radial lines, making local defects inevitable.
现有的有关联络接线的规划都是在已完成辐射线路布局的基础上进行的联络线再优化,这样就不可避免地存在局部性的缺点。
应用推荐