• After the road projects were completed, Olken had engineers dig up core samples in each road to estimate the quantity of materials used.

    在道路项目完成后,Olken让工程师在各条道路上挖取核心样品,以估算使用的材料的数量。

    youdao

  • After the upper work completed, by the use of FLAC3D to make a simulation and analysis to land subsidence and the horizontal shift quantity caused by the topside load.

    在此基础上,利用FLAC3D软件对上部荷载引起地面沉降量及水平位移量进行模拟计算。

    youdao

  • The company follows the quantity system flow chart and Achieving products flow chart to proceed the operation, which guarantees the molds being completed on time with high quality.

    公司严格遵循质量系统流程图和产品实现流程图来进行运作,保证了模具的按时完成和生产质量。

    youdao

  • The company follows the quantity system flow chart and Achieving products flow chart to proceed the operation, which guarantees the molds being completed on time with high quality.

    公司严格遵循质量系统流程图和产品实现流程图来进行运作,保证了模具的按时完成和生产质量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定