The study is of opinion that the uncertainty contribution of RON measurement system is, by using this technique, consisted of quality control (QC) sample and in-statistical RON results.
研究表明,采用该技术来评估RON检测系统的不确定度,其贡献量分别是由质量控制(QC)样品和受控RON测试结果两部分合成。
Does factory QC compare first piece samples with approval sample and specification sheet?
工厂QC是否根据客户签样和产品规格表来制定首件样品?
Does factory QC compare first piece samples with approval sample and specification sheet?
工厂QC是否针对批准样板和规格书对比首件样板?
By using this technique, the dynamic uncertainty contribution of an analytical measurement system comprises of uncertainties of quality control (QC) sample measurements and linear fitting.
本研究认为,采用该技术来进行分析测量系统的动态不确定度评估,其贡献量可由质控样品(QC)和线性拟合两部分合成。
Does factory QC compare first piece samples with approval sample and specification sheet?
工厂QC是否比较首件样品抽样检验和批准的规格表?
Does factory QC compare first piece samples with approval sample and specification sheet?
工厂QC是否比较首件样品抽样检验和批准的规格表?
应用推荐