• The peak of its pylon is 452 feet high, while the bridge's total length is just shy of a mile.

    最高塔架高达452英尺,而桥全长度不足一英里。

    youdao

  • It extends six legs into the seabed to stabilize itself before installation of the pylon on which each turbine sits.

    在安装每架涡轮机的支柱前,这艘安装船先将六条腿伸入海床中,以便稳定船只本身。

    youdao

  • There are no arms. The six cables that pass from one pylon to another are each borne by two insulators attached to the poles.

    两个高塔之间通着6根电缆,每根有两个附在高塔上的绝缘体。

    youdao

  • The cardio portion involves bootcampers running around park trails and zigzagging through pylon -marked obstacle courses on the field with their leashed canine companions.

    在心肺锻炼部分,学员们要绕着公园里的小路跑步,并和他们的爱犬一起穿梭通过路障。

    youdao

  • The A-frame pylon harmonizes with the tall spires of the adjacent cathedral.

    A形塔架同附近教堂的高耸尖塔十分协调。

    youdao

  • Stays are continuous over saddles in the pylon.

    拉索连续跨过塔架内的索鞍。

    youdao

  • A lineman is trying to repair the damaged pylon.

    线务员正试图修理被损坏的电缆塔。

    youdao

  • The cables intersect the tower or pylon at different heights.

    钢索在桥塔或塔柱的不同高度上相交。

    youdao

  • No damage and fluid fluid leakage from engine pylon and cowling doors.

    发动机吊架和整流罩无液压油渗漏和损伤。

    youdao

  • The pylon cell units were hoisted to the deck by the transfer derrick.

    塔室块件由传递用的转臂吊机吊放在桥面上。

    youdao

  • Tank shell by welding together steel plates with the pylon, lined masonry firebrick.

    罐外壳由钢板与吊架焊接而成,内衬砌筑耐火砖。

    youdao

  • The stress distribution of cable-pylon anchorage zones under U-prestressing tendon is analyzed.

    分析了U形钢束作用下索塔锚固区应力大小及分布情况。

    youdao

  • The pylon of Guilin Nanzhou Bridge is curve, and the steel anchor beam system on pylon is complicated.

    南洲大桥为弯塔斜拉桥结构。该桥的斜拉索采用钢锚梁锚固系统。

    youdao

  • The helicopter lifted up the steel pylon, transported it to the site, and dropped it gently into place.

    直升飞机把高压电缆铁塔吊起,运至工地,然后轻轻放下使之就位。

    youdao

  • The conclusions of this paper offer reference for the design of no back-stays & inclined pylon cable-stayed bridge.

    本文的工作为无背索斜塔斜拉桥的设计提供了参考。

    youdao

  • The method of motion analysis of new type and long stroke pumping unit with vertical walking-beam and pylon was studied.

    对新型长冲程抽油机——竖游梁塔架式抽油机的运动分析方法进行了研究,导出了该机悬点位移、速度及加速度的计算公式。

    youdao

  • The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.

    主塔基础采用分离式承台钻孔桩基础,两承台设横系梁连接,系梁为预应力混凝土结构。

    youdao

  • This thesis sets out to make brief introduction of the full-scale model test and test result of the anchorage zone of the pylon.

    本文简要介绍了索塔锚固区节段足尺模型试验及试验结果。

    youdao

  • The article introduces the design of level bearing performance experiment model for cable pylon anchorage zone of Yellow River No.

    该文介绍了济南黄河三桥索塔锚固区水平受力性能试验模型的设计;通过有限元分析,对试验模型和实际结构的受力进行了比较。

    youdao

  • This paper introduced the installation procedure of large bridge-type pylon and analyzed its working principle and control strategy.

    介绍了大型桥式塔架的安装过程,分析了其安装控制系统的工作原理和控制策略。

    youdao

  • The speed fields and circulation distribution of wing-pylon combination, and the surface pressure distributions of the stores are given.

    给出了机翼—挂架组合体的速度场,环量分布和外挂表面的压强分布。

    youdao

  • Nanjing Third Yangtze River bridge is the super-huge cable-stayed bridge in China which first applied in the construction of steel-pylon.

    南京长江三桥为我国首座采用钢索塔的特大型斜拉桥。

    youdao

  • Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.

    索塔·拉索锚固区是斜拉桥中的关键部位,其作用是将拉索的局部集中力安全,均匀地传递到塔柱。

    youdao

  • In cable-stayed Bridges the force and structure in pylon-cable anchorage area are more complex. The area belongs to a key part in a cable-stayed bridge.

    斜拉桥中塔索锚固区受力和结构都比较复杂,属于斜拉桥中的关键部位。

    youdao

  • Construction of bored piles in steel cofferdam as pylon foundations in main channel for the SecondChangjiang River Bridge in Wuhan is emphatically recounted.

    重点介绍了位于长江主航道上武汉长江二桥斜拉桥主塔墩基础双壁钢围堰及钻孔桩的施工。

    youdao

  • Construction of bored piles in steel cofferdam as pylon foundations in main channel for the SecondChangjiang River Bridge in Wuhan is emphatically recounted.

    重点介绍了位于长江主航道上武汉长江二桥斜拉桥主塔墩基础双壁钢围堰及钻孔桩的施工。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定