• The ground floor consists of an arcade, obtained by pulling back the building's perimeter wire of the main facade, thus allowing the integration between the street level and the new building.

    包含一个拱廊,它是通过建筑主表面的边缘线条向里收缩形成,它将街道建筑融为一体

    youdao

  • The sequent wire-pulling is used in electric powered rig as it has smooth lifting system and cross wire-pulling is used in mechanical rig as balanced force relief impact force by compressed ai.

    穿法一般电动钻机采用,主要考虑到电控操作提升系统比较平稳; 花穿法一般在机械钻机上使用受力平衡缓解气控操作带来的冲击载荷的影响。

    youdao

  • The sequent wire-pulling is used in electric powered rig as it has smooth lifting system and cross wire-pulling is used in mechanical rig as balanced force relief impact force by compressed ai.

    穿法一般电动钻机采用,主要考虑到电控操作提升系统比较平稳; 花穿法一般在机械钻机上使用受力平衡缓解气控操作带来的冲击载荷的影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定