Resource-constrained project scheduling problem is a typical issue in project scheduling management.
资源约束项目调度问题是项目进度管理中的典型问题。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
The resource-constrained project scheduling problem (RCPSP) is NP problem, most of commercial project management software usually employ simple priority rules for solving the problem.
资源平衡优化问题即资源有限项目调度问题,是一个NP难问题,现在商用项目管理软件系统中的资源平衡优化问题多采用基于优先规则的启发式算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
There is resources conflict problem in the process of resource-constrained project scheduling, which seriously affects the execution of project activity.
在资源受限的项目调度过程中存在着资源冲突问题,严重影响着项目活动的执行。
The main problem discussed in this paper is the construction project scheduling mathematical model and a simple algorithm in the uncertain resource environments.
本文主要建立了具有不确定资源约束条件下的结构项目排序问题的一个数学模型。
The project payment scheduling problem with bonus-penalty structure is defined and its assumptions are identified firstly.
首先明确了研究的假设条件并对具有奖励惩罚结构的项目支付进度问题进行了定义;
For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。
For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。
应用推荐