• Project network technique is presently a frequently-used method to make project schedule plan.

    目前工程项目进度计划编制多采用网络计划方法

    youdao

  • Test motivators are documents that may relate to the test effort, such as a project schedule, a requirements document, or a project plan.

    测试激发因素和测试努力相关文档例如项目进度表、一个需求文档或者一个项目计划

    youdao

  • An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.

    评估项目计划安排一个重要组成部分,评估不当结果就是项目失败

    youdao

  • Planning - Define a strategy to develop and deliver a project plan, calculate overall and detailed sizing, define a work schedule, and establish milestones for major checkpoints.

    计划 ——定义项目战略包括开发交付项目计划计算规模各个部分的规模、定义工作进度表主要检查点建立里程碑

    youdao

  • The project manager, on the other hand, is more concerned with managing the project plan in terms of resources, schedule, and cost.

    一方面,项目管理者更加关注资源进度成本等方面管理项目计划

    youdao

  • The project plan details the tasks, schedule, cost, resources, milestones, and deliverables needed to complete the project.

    项目计划详细描述任务时序成本资源里程碑完成项目所需可交付工件

    youdao

  • The integrated project plan ensures that dependencies between groups are managed and the project remains on schedule and within budget.

    集成项目计划确保团队之间相互依赖可管理范围内,项目能够按日程表的进度进行以及不超出预算。

    youdao

  • This step is performed throughout the life of the project and ensures that the work results lines up with the schedule plan.

    一步贯穿项目始末,它保证工作计划相一致。

    youdao

  • The use cases shown in Table 1, along with a two-page project plan that includes an MS Project Schedule export, constitute the documentation.

    1包含MSproject进度表输出的两项目计划共同构成文档文件

    youdao

  • Setup schedule for all purchasing items and submit it to NPI project leader in time at project beginning. This schedule should include measurable goaldelivery plan.

    项目开始所有采购事宜设定计划时间表递交报告产品领导人这个计划时间表应当包括可衡量目标交货计划

    youdao

  • Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解等。

    youdao

  • According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.

    按照批准工程进度计划,协调专业进度计划实际运转督促进度计划实施

    youdao

  • Project Leader will ensure to deliver new product to mass production on schedule with Quality Plan.

    产品导入项目领导人确保新产品按时按质递交批量生产。

    youdao

  • Setup schedule for all purchasing items and submit it to NPI project leader in time at project beginning. This schedule should include measurable goal delivery plan.

    项目开始所有采购事宜设定计划时间表递交报告产品领导人这个计划时间表应该包括可衡量的目的—交货计划

    youdao

  • During the process from plan to completion, the project team has experienced a series problem center on cost of the building, construction quality, construction schedule and so on.

    项目设计团队笔下理想成为落地实物的过程中,经历围绕项目造价施工质量工期进度一系列问题艰难博弈。

    youdao

  • Set up active plan according to project target and schedule.

    根据项目目标进度制定行动计划

    youdao

  • Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    youdao

  • The project plan contains the functional specification (combined plans of each team) and a schedule. The project plan approved milestone is permission from management to proceed with the deployment.

    项目计划包含功能说明(每个工作组合并计划)日程。项目计划批准里程碑管理人员批准继续进行部署。

    youdao

  • Project development plan, and the project execution schedule control and management.

    制定项目开发计划项目执行进度进行控制管理

    youdao

  • It is crucial for successful project management and schedule control to have a scientific and efficient project execution plan.

    制定套科学高效项目实施计划并按计划进行进度控制成功实施项目管理,使工程按期投产的主要因素。

    youdao

  • By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.

    通过分析专业实际进度专业计划进度差距结合实际找到适合项目特点进度控制方法

    youdao

  • The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.

    实例研究表明本文提出方法更好地计划控制项目费用进度目标

    youdao

  • The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.

    结果显示模型能够帮助项目经理制定风险管理计划合理的进度计划。

    youdao

  • In accordance with the characteristics of expansion project of Huanglongtan Power Plant, the optimized plan for the construction was designed and the project time schedule was guaranteed.

    根据龙滩电厂扩建工程特点设计工程建设优化方案,确保了工期目标。

    youdao

  • Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.

    同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解等。

    youdao

  • The project plan and schedule.

    项目计划工作流程计划

    youdao

  • Discuss the base project plan elements: project Task List, schedule, Communication plan, meeting schedules, project administration, etc.

    讨论一些基本项目计划要素:项目任务清单日程计划表(进度表),沟通计划,会议时间表,项目管理

    youdao

  • Discuss the base project plan elements: project Task List, schedule, Communication plan, meeting schedules, project administration, etc.

    讨论一些基本项目计划要素:项目任务清单日程计划表(进度表),沟通计划,会议时间表,项目管理

    youdao