• Described the YBK-2000 project progress management present situation and the existence main question.

    描述YBK- 2000项目进度管理现状存在主要问题。

    youdao

  • Under FIDIC condition of contract, the project progress control mainly includes project progress management, project delay and project extension stipulation.

    FIDIC合同条件下工程进度控制主要包括有关工程进度计划管理工程延误、工程延期规定

    youdao

  • First, this article described the project progress management function, as well as rivers and streams company YBK-2000 project enhancement progress management necessity.

    首先本文描述项目进度管理作用以及江河公司Y BK- 2000项目加强进度管理的必要性。

    youdao

  • Integrated work item Management automatically creates and tracks progress of individual work items in accordance with the team process and project rules that you define.

    集成化工作管理会自动创建追踪团队进程所定义项目伴随的私人工作进展

    youdao

  • Objective measurements are made in every iteration by testing the release produced, providing management and quality indicators, as well as measuring project progress.

    通过每次迭代过程中测试生产出的版本提供管理质量指示器以及测量项目进展来进行客观度量

    youdao

  • In test-process management, you can also use the application to track the progress of the test project for the team.

    测试过程管理中,可以一直使用程序团队追踪测试项目进展

    youdao

  • They do not ask the right questions to gauge project progress, and they are ill-equipped to provide appropriate management guidance.

    他们不能提出正确问题估计项目进度并且他们不能提供适当管理指导。

    youdao

  • This helps the team lead and management team get a better grasp on the progress of project, and every team member is easily able to get their work status.

    可以帮助团队领导管理团队更好地掌握项目过程每一个团队成员可以更加轻松地了解他们工作状态。

    youdao

  • Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.

    网络计划技术施工项目管理行之有效的一种管理方法,进度计划管理中得到了广泛推广应用

    youdao

  • ScrumWorks pro is an Agile Project Management tool that help track team (s) progress through individual iterations and whole releases.

    ScrumWorksPro一个敏捷项目管理工具,它能够帮助团队跟踪每次迭代整个版本发布的过程

    youdao

  • The research is mainly focused on the optimization of Project management with Cost, Quality and Progress, puts forward the method of optimization.

    文中着重研究项目管理成本质量进度三个方面优化问题,分别提出了优化方法

    youdao

  • Progress control is a major content of project management.

    进度控制项目管理一个主要内容

    youdao

  • The paper expatiates the management emphases and method of progress, quality and safety in the process of construction project building.

    本文着重阐述建设项目施工过程进度质量安全管理重点方法

    youdao

  • On the basis of quality, how to carry out progress and cost management is the key of project management .

    保证工程质量前提下如何进行进度成本管理项目管理的关键

    youdao

  • Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.

    通过涟钢工程施工过程回顾总结提出了总承包项目施工进度管理有效措施

    youdao

  • Beijing Albert Park Project Management Corporation (BSC) : a market-oriented training compound talent to promote technological progress building internationally competitive institutions.

    北京派克工程建设监理公司(BSC):市场为导向推进技术进步培养复合人才建设具有国际竞争力的监。

    youdao

  • Progress management is a main content of project management.

    进展管理项目管理一项重要内容

    youdao

  • Abstract: : on the road and bridge construction projects, management is the core part of project construction, a direct impact on project progress and project quality.

    摘要路桥工程项目建设中管理工程建设核心环节直接影响到工程进度以及工程质量。

    youdao

  • Road and Bridge construction site management is the core of construction management, site management effectiveness directly impacts project quality, progress and efficiency.

    路桥工程施工现场管理施工管理的核心,现场管理效果好坏直接影响工程质量进度效益

    youdao

  • EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.

    而挣值管理作为一种新兴项目集成化管理技术能够实现产品研发进度成本质量技术的综合管理控制

    youdao

  • Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.

    安装工程开工前技术准备工作非常重要保证工程进度、工程质量降低工程成本搞好现场HSE管理先决条件。

    youdao

  • The defect of the traditional project management software in the progress management is analyzed.

    分析了当前工程管理软件进度管理上的不足

    youdao

  • Progress management, an important branch of project management, is the key management tache ensures the project completed on time.

    进度管理项目管理一个重要分支,进度控制保证项目按期完成关键管理环节。

    youdao

  • P3 is a project management software that can dynamically trace & control whole project progress.

    工程管理软件P3对工程进度全过程进行动态跟踪控制

    youdao

  • Importance of strengthening project technical management, and how to carry out quality, safety management, progress management, cost management and construction site management are elaborated.

    本文论述加强工程技术管理重要性怎样搞好质量管理、安全管理、进度管理、成本管理、施工现场管理的方法和步骤。

    youdao

  • 'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.

    现代项目管理中的进度一个综合指标,它施工项目任务工期成本资源有机地结合起来,能全面反映项目的施工状况。

    youdao

  • Optimizing schemes by using the principle of cost project in the progress of commission designing management, which is generally used in the world, can unite the technique and economics tightly.

    工程设计管理过程利用价值工程原理进行设计方案的优选国际上普遍采用方法,可以技术经济圆满地统一起来

    youdao

  • Optimizing schemes by using the principle of cost project in the progress of commission designing management, which is generally used in the world, can unite the technique and economics tightly.

    工程设计管理过程利用价值工程原理进行设计方案的优选国际上普遍采用方法,可以技术经济圆满地统一起来

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定