After verification, the programme to achieve the basic project management processes, standardization and institutionalization, and ensure high-quality projects completed on time.
经过验证,该方案基本实现工程管理的流程化、规范化、制度化,保证各个项目按时高质量的完成。
Project Management: Audit Implementation Programme, Regulatory implementation of the project to Ensure good operation;
项目管理:审核执行方案及排期,监管项目的执行情况、流程进度和成本控制,确保良好运行;
Wave 2 will introduce and integrate strategic management functions such as budgeting, results-based management, risk management, resource mobilization, programme management and project management.
第2波将引进和整合各种战略管理功能,例如预算编制、成果管理制、风险管理、资源调动、方案管理和项目管理。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
应用推荐