Because of the complexity of the project optimization problem, the traditional optimization method can hardly be used to solve.
由于工程最优化问题的复杂性,传统的最优化方法一般很难求解。
This text carries on the research to the system of GPRS and the application provide, discussing several kinds net project based on GPRS and the method dealing with the line problem.
本文对GPRS系统以及所提供的业务进行了研究,讨论了几种基于GPRS的组网方案以及解决掉线问题的方法。
The calculating theory and designing method of pre-stress reinforcement concrete structure plasticity is one of thorny problem that the theory circle and project circle pays close attention to.
预应力混凝土结构塑性计算理论与设计方法是理论界和工程界十分关注且较为棘手的问题之一。
In order to solve the above problem, this article proposes the method of dynamic integrated management by objects of construction project.
为了解决以上问题,本文提出施工项目目标动态集成管理的方法。
At the same time, the method and basic theory of dynamics software ADAMS are introduced. The project studies the key technical problem of establishing hydraulic support virtual prototype model.
同时,介绍了多体系统动力学软件ADAMS的基础理论和方法,研究了建立液压支架虚拟样机模型的关键技术问题。
This paper analyses the decision? making for road engineering project problem on basis of theoretical correlation degree and hierarchy analysis method of gray? system theory.
根据灰色系统理论关联度和层次分析法,分析公路工程项目建设方案的决策问题。
Therefore, uses the method which the PLC simulation software and the computer unify in solution curriculum project program debugging difficult problem, can receive the good effect.
因此,采用PLC仿真软件与计算机相结合的方法,解决课程设计中程序调试的难题,能收到较好的效果。
Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented.
建立了研发项目多执行模式随机资源约束项目调度问题模型。
This problem provides a new effective method for basis of managing highway engineering project cost.
这也为公路工程造价提供了一个新的有效的方法。
In 1st chapter, introduce the necessity to use project management method with software and the ubiquitous quality problem in the process of software project management.
本文第一章主要介绍对软件实行项目管理的必要性和在软件项目管理过程中普遍存在的质量问题。
In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed.
本文研究了资源有限—工期最短的优化问题,提出了相应的分枝定界算法。
Therefore, the heat-measuring method was used in this project to study the solidification problem in the complex cavity.
本文应用量热法,来研究复杂几何腔内的固液相变问题,其实验技术方法和结果分析具有现实意义和参考价值。
Therefore, the heat-measuring method was used in this project to study the solidification problem in the complex cavity.
本文应用量热法,来研究复杂几何腔内的固液相变问题,其实验技术方法和结果分析具有现实意义和参考价值。
应用推荐