Comparison and succeed degree evaluation are the common methods of project post evaluation. This article makes the two methods more practical by analyzing and improving them.
对比法和项目成功度评价法是项目后评价的常用方法,对这两种方法进行了分析和改进,使之更具实用性。
The main methods of project post evaluation include: logical framework approach, with and without comparison, analytical hierarchy process, cause and effect analysis and comprehensive evaluation.
项目后评价的主要方法有:逻辑框架法、有无对比法、层次分析法、因果分析法和综合评价法等。
Project post evaluation is an important part in irrigation and drainage project management.
大型排灌工程项目后评价是大型排灌工程项目科学管理的重要环节。
With the matureness of technology on the method of project evaluation, Qinghai power Company puts forward a clear guiding method on power project post-evaluation.
当前项目评价方法日趋成熟,青海省电力公司对电力项目后评价也提出了明确的指导办法。
Water conservancy construction project post-evaluation includes course evaluation, economic evaluation, affection appraising, project goal assessment and constant appraisal.
水利建设项目后评价包括过程评价、经济评价、影响评价、项目目标和可持续性评价。
From the view of evaluation content, the current soft science project post-evaluation focuses on the level of research results and economic benefits, but neglects sustainability and social evaluation.
从评价内容来看,目前的软科学项目后评价主要集中于项目的科研成果水平和经济效益等方面,对项目的持续性评价、社会效益评价等还很薄弱。
Finally, three major problems of commercial real-estate project post-evaluation which should pay attention are proposed, land obtaining, the management pattern and the social feedback question.
最后提出了商业地产项目后评价中应注意的三大问题:用地取得、经营模式和社会反馈问题。
On the project post-evaluation, the thesis introduces its conception, characteristics, classification, and discusses its basic process, main content and its guideline system.
关于项目后评价则主要介绍了后评价的概念和特点、分类,探讨了后评价的基本步骤、后评价的主要内容、后评价的指标体系等。
However, these contents are very important to soft science project post-evaluation.
然而,这些后评价内容对于软科学项目是十分重要的。
However, these contents are very important to soft science project post-evaluation.
然而,这些后评价内容对于软科学项目是十分重要的。
应用推荐