This article discusses a successful application of the big span steel structure truss assemble prefabricated parts and slip technology in Qingdao Liuting International Airport project phase II.
广州名盛广场工程,采用全逆作法施工钢结构设计方案,并且将路桥工程采用的大跨度拱形钢桁架结构应用于房建工程的转换层结构,这是一种新的尝试。
This will comprise Phase II of the project, which requires additional funding before it can begin.
这将包括项目第二阶段,在其开始之前需要补充供资。
And ultimately get construction projects in Anhui Province and Nanjing Network VOD VOD Phase II construction project performance.
并最终取得安徽省网vod建设项目和南京VOD二期建设项目的业绩。
Static lab test and dynamic simulation on neutral water reuse with limestone-concrete treatment, which was used in Weifang Power Plant, Phase II Expansion Project, have been conducted.
针对潍坊电厂二期扩建工程应用石灰-混凝处理法,将中水作为循环水的工艺进行了静态试验室试验和动态模拟试验。
Structural and mechanical design are performed according to the requirement on the overall design and design input for the reactor pressure vessel support of Qinshan Phase II NPP Project.
根据总体设计要求和设计输入要求,进行了秦山核电二期工程反应堆压力容器支承的结构设计和力学设计。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。
This paper introduces the mechanical analysis involved in the design of the main equipment for the reactor and the reactor coolant system for Qinshan Phase II NPP Project.
介绍了秦山核电二期工程反应堆冷却剂系统主设备设计中所涉及的力学分析工作。